|
Hot-Machined Asphalt Mixture (Cbuq), For Cold Application In Emergency Preventive Maintenance (Pothole Filling) Of Asphalt Paving; Binder/Machining Temperature 107-177C; Prepared With Petroleum Aggregates 10-15C Above The Binder, Cap 50/70, Bitumen Content Between 5.5% To 6.5%, Modified By Polymers And Mixing Processes; Passing Granulometry Not Less Than 97% On Sieve 3/8; Resistance To Induced Moisture Damage Min 0.70; Transport/Application Temperature According To Compaction Range ±5C; Storable For Up To 12 Months And Packed In 25Kg Bags. According To Resolution Anp 897/2022, Dnit 031/2024-Es, Dner-Es 385/99 And Abnt/Nbr Standards (6576, 12048, 12052, 12948, 12949, 14491, 15617). Included Shipping To Horizontina/Rs, Asphalt Cement Cap 50/70; Softening Point Min 46C; Saybolt-Furol Viscosity (A 135C Min 141S; At 150C Min 50S); Brookfield Viscosity (A 135C Min 274 Cp); Ductility At 25C, Min 60 Cm; Flash Point Min 235C; Solubility In Trichlorethylene Min 99.5% Mass; Thermal Susceptibility Index -1.5 To +0.7; Retained Penetration After Aging (Rtfot) Min 55%; Transport/Storage Temperature 140-170C. According To Anp Resolution 897/2022 And Abnt/Nbr Standards (6293, 6560, 6576, 11341, 14855, 14950, 15184). Included Shipping To Horizontina/Rs, Asphalt Emulsion Rr - 1C; Saybolt-Furol Viscosity (A 25 C, Max 90 S); Bitumen Content In Residue Min 97% Mass; Sedimentation (Top/Bottom Difference) Max 5% Mass After 5 Days; Sieving (0.84 Mm Sieve) Max 0.10% Mass; Water Resistance 80%; Positive Particle Charge; Asphalt Waste By Distillation Min 62% Mass; Demulsibility Min 50% Mass; Residue Penetration (25 C, 100 G, 5 S) 40-150 0.1 Mm; Residue Ductility At 25 C Min 40 Cm; Storage Temperature 4-55C; Application Temperature 10-50C; Stockable For Up To 30 Days; Require Homogenization Before Use. According To Resolution Anp 897/2022, Technical Regulation Anp 6/2012, And Abnt/Nbr Standards (6293, 6567, 6569, 6570, 14249, 14376, 14393, 14491). Included Shipping To Horizontina/Rs, 04/16/2026 - 08:37:06, 04/16/2026 - 08:37:07
|