The Subject Of The Order Is The Execution Of Works For The Task Called Construction Of A Multi-Purpose Sports Field With A Polyurethane Surface At Primary School No. 12 In Siedlce On The Plot With Registration Number 142, Precinct 90, Along With The Equipment. The Task Was Co-Financed By The Funds For The Development Of Physical Culture Under The Sportowa Polska Program - Local Sports Infrastructure Development Program - 2024 Edition As Part Of The Task Entitled: Modernization Of Multi-Purpose Sports Fields At Primary School No. 5, Primary School No. 10 And Primary School No. 11 And Construction Of A Multi-Functional Sports Field At Primary School No. 12 In Siedlce. The Multi-Functional Field Includes: - A Handball Field With A Playing Field Of 20.0 X 40.0 M, Two Basketball Courts With A Playing Field Of 15.0 X 24.0 M Each, A Volleyball Court With A Playing Field Of 9.0 X 18.0 M, A Tennis Court With A Playing Field Of 10.97 X 23.78 M. A Safety Belt (Run Area) Is Provided Around The Handball Court With A Total Width Of 2.0 M And A Surface Similar To The Playing Field. Dimensions Polyurethane Surface: - Width - 24 M - Length - 44 M - Area - 1,056.00 M2 The Scope Of The Investment Includes: 1. Construction Works, Including: Preparatory And Demolition Works, Dismantling, Removal And Disposal Of Demolition Materials, Execution Of Earthworks, Drainage Layer, Crushed Aggregate Foundation, Wedging And Leveling Layer For The Polyurethane Surface, Setting The Edges On The Concrete Bench, Placing The Sleeves, Making A Flexible Base Layer, Making A Polyurethane Surface, Painting The Lines Of The Pitches.2. Sports Equipment - Handball Courts, Two Basketball Courts, Volleyball Courts And Tennis Courts. 3. Development Of Greenery, Cleaning Of Drainage. 1) The Detailed Scope Of Works Is Presented In The Design Documentation, Additional Drawings And The Technical Specification For The Execution And Acceptance Of The Works, Which Are An Annex To The Specifications Of The Terms Of The Contract, While The Bill Of Quantities Should Be Treated As An Additional, Auxiliary Annex. The Contractor Should Check The Bill Of Quantities Against The Design Documentation At The Stage Of Preparing The Offer And Price All Works Specified In The Documentation, Including The Design Drawings. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Of Works In A Larger Quantity Than That Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Or Stwiorb.2) All Documents Describing The Subject Of The Contract Should Be Treated As Mutually Complementary And Explanatory In The Sense That In The Event Of Any Ambiguities Or Ambiguities, The Contractor Cannot Limit The Scope Of His Obligation Or The Scope Of Due Diligence In The Performance Of His Obligations Arising From The Contract. Public.
Contact Information
Address
Miasto Siedlce,Siedlce,08-110,Mazowieckie,Pl925 - Siedlecki
Email
Magdalena.Glasek@um.siedlce.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111889505
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.