|
1. The Subject Of The Order Is The Implementation Of An Investment Including The Reconstruction Of Fire Access Road No. 12, 4207.70 M Long, Located On The Forest Land Of The Jamy Forest District In The Skarlin, Wąkop And Łąkorz Forest Districts, Rev. Łąkorz, Commune Biskupiec, Nowe Miasto County, Warmian-Masurian Voivodeship The Works To Be Performed Include: - Adjustment Of The Geometric Parameters Of The Road - Widening Of The Road Surface At Passing Places - Removal Of Stumps - Construction Of A Roadbed - Profiling And Compaction Of The Subgrade - Construction Of A Drainage Layer Of Sand - Construction Of A Sub-Base Of Mechanically Stabilized Crushed Aggregate - Construction Of A Surface Of Stabilized Crushed Aggregate Mechanically - Construction Of Exits And Roadsides Made Of Mechanically Stabilized Crushed Aggregate - Construction Of Wood Storage Areas Made Of Stabilized Crushed Aggregate - Mechanically - Construction Of Sewage - Cleaning Works - Preparation Of Post-Construction Inventory The Works Should Be Performed In Accordance With The Technical Conditions For The Execution And Acceptance Of The Works, Construction Art, Construction Design, And The Construction Site Should Be Managed By A Construction Manager With Unlimited Qualifications In The Appropriate Specialty. 2. Place Of Implementation: - Area Of The Skarlin, Wąkop And Łąkorz Forest Districts; Plots No. 3130/3, 3131, 3132, 3152, 3153, 3154, 3155, 3156, 3171/1, 3172/1, 3173, 3174, 3175, 3211/2, Rev. Łąkorz, Commune Biskupiec; Nowe Miasto County, Warmian-Masurian Voivodeship.3. The Detailed Scope Of Works Was Determined Based On: Design Documentation, Bill Of Quantities, Technical Specification For Execution And Acceptance Of Works.4. General Provisions Regarding The Subject Of The Order: A) The Ordering Party Does Not Envisage Awarding Orders Referred To In Art. 214 Section 1 Point 7 Of The Act On Public Procurement, B) The Ordering Party Does Not Allow Settlements In Foreign Currencies. C) The Ordering Party Does Not Provide For The Requirements Referred To In Art. 96 Section 2 Points 2 Of The Public Procurement Law. D) The Ordering Party Does Not Reserve The Right To Apply For The Contract Only By Contractors Referred To In Art. 94 Of The Public Procurement Law.E) The Ordering Party Does Not Provide For Reimbursement Of The Costs Of Participation In The Proceedings, Except For The Situation Referred To In Art. 261 Pzp.F) Subcontracting - The Ordering Party Does Not Require The Contractor To Personally Perform Key Tasks Referred To In Art. 60 And Art. 121 Of The Public Procurement Law - The Contractor May Entrust The Execution Of Part Of The Order To A Subcontractor. In Such A Case, The Contractor Is Obliged To Indicate In His Offer The Part Of The Order (Scope) The Execution Of Which He Intends To Entrust To Subcontractors, Along With The Names Of These Subcontractors. - If The Subcontractor Is Entrusted With The Execution Of Part Of The Order For Construction Works Or Servi
|