|
1. The Subject Of The Order Includes The Construction Of: 1.1 In The Town Of Małachowo Złe Głos, At The Village Community Center, Plot No. 88/1, The Following Scope Of Works Should Be Performed: - Construction Of A Wooden Shelter With Dimensions Of 13 M X 5 M - Roof Covered With Metal Tiles In Accordance With The Replacement Drawing For The Documentation (Including A Rainwater Tank), - Bench Tables - 2 Pcs. - Street Lamp With Renewable Energy Technology - 1 Pcs. - Bicycle Stands - 2 Pcs. (8 Parking Spaces), - Plantings - Lavender, Ornamental Grasses. 1.2 In The Town Of Kamionka, At The Koźlak Windmill, Plot No. 78/1, The Following Scope Of Works Should Be Performed: - Construction Of A Wooden Shelter With Dimensions Of 20 M X 4 M - Roof Covered With Metal Tiles In Accordance With The Replacement Drawing (Including A Rainwater Tank), - Bench Tables - 2 Pcs. - Street Lamps With Renewable Energy Technology - 2 Pcs, - Bicycle Racks - 2 Pcs, (8 Parking Spaces), - Fencing Of The Area 145 Meters, - Hardening Of The Area With Cubes - 340 M2, - Plantings - Lavender, Ornamental Grasses, - Electrical Works. The Execution Of The Task Additionally Includes: 1) Comprehensive Surveying Services, 2) Organization, Development And Liquidation Of The Construction Site, 3) Organization And Marking Of The Construction Site, 4) Ensuring Access To Other Properties On The Property During The Works, 5) Renovation And Repair Of Damaged Surfaces In Streets And Sidewalks, 6) Comprehensive As-Built Documentation And Surveying Inventory, 6) Waste Generated, Including All Types Aboveground, Underground, Inorganic And Organic Residues Such As Rubble, Scrap, Stumps, Roots, Etc. Should Be Transported To A Landfill Without Undue Delay Or Handed Over To An Entrepreneur With A Permit To Transport Waste. 7) Tidying Up The Construction Site After The Completion Of The Works. The Ordering Party Requires That Materials Be Transported To The Place Of Execution Of The Order By Vehicles That Meet The Exhaust Emission Standard Of At Least Euro 5. At Each Request Of The Ordering Party, The Contractor Will Submit A List Of Vehicles Together With Copies Of Registration Certificates Or Other Documents Confirming Compliance With The Above-Mentioned Requirements Within 2 Business Days. Standards. Failure To Fulfill The Above Obligation Will Be Treated As Improper Performance Of The Contract And Will Result In A Contractual Penalty Of Pln 500 For Each Identified Case Of Violation. Please Note That The Task Does Not Include The Delivery And Installation Of A Multimedia Board And Area Monitoring. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 4 To The Swz. Note: When Implementing The Contract, The Contractor Will Be Obliged To Act In A Manner Consistent With The Principle Do No Serious Damage Within The Meaning Of Art. 17 Regulation (Eu) No. 2020/852 Of The European Parliament And Of The Council Of 18 June 2020 On Establishing A Framework To Facilitate Sustainable Invest
|