|
The Subject Of The Order Is The Performance Of Construction Works Consisting In The Renovation Of The Road Surface Of Ul. Moniuszki On The Section From Ul. Młodzieżowa To Ul. Mozart, Including Securing Trees, Milling The Existing Surface, Making New Bituminous Layers, Reconstructing Speed Bumps, Replacing Curbs, Adjusting Underground Infrastructure Devices And Implementing Horizontal Markings And Elements To Improve Traffic Safety. The Works Should Be Performed In Accordance With The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Including St Dm.00.00.00 General Requirements), Applicable Standards And Legal Regulations.1. Material Scope Of Works1.1. General Requirements As Part Of The Task, The Contractor Is Obliged To: • Adapt To The General Requirements Contained In St Dm.00.00.00, • Develop A Temporary Traffic Organization Project And Agree On It, • Introduce, Maintain And Dismantle The Temporary Traffic Organization, • Ensure The Required Industry Supervision, • Perform Measurement Works And Mark Out The Works, • Ensure Road Traffic Safety And Proper Protection Of Trees And The Work Area.1.2. Demolition Works And Road Construction. The Scope Includes The Construction Of A Complete Parking Surface Structure: • Dismantling Of Concrete Curbs With A Concrete Footing, Including Removal And Disposal, • Dismantling Of Prefabricated Speed Bumps And Islands, Along With Disposal, • Milling Of A 4 Cm Thick Asphalt Surface, Along With Removal And Disposal Of The Milling Cutter In Accordance With Applicable Regulations, • Laying A Binding Layer With Ac 16W Asphalt Concrete With A Thickness Of 4 Cm, Including Cleaning Of The Substrate And Sprinkling, • Laying A Wearing Course Of Ac 11S Asphalt Concrete, 4 Cm Thick, Together With Cleaning The Substrate And Sprinkling Between Layers, • Construction Of A Speed Bump Using Bituminous Technology By Laying A Layer Of Ac 11S Asphalt Concrete, 10 Cm Thick, Along With Cleaning And Sprinkling Of The Substrate. Materials Used For The Works Must Meet Standard Requirements And Have Current Declarations Of Conformity Or Certificates.1.3. Street Elements And Height Adjustment Of External Devices. The Scope Includes: • Installation Of Concrete Curbs (Straight, Drive-On And Inclined) On A Concrete Footing Made Of C12/15 Concrete With A Thickness Of 15 Cm, • Adjustment Of Street Inlets With C25/30 Concrete Up To A Height Of 5 Cm, • Adjustment Of Sewer Manholes With C25/30 Concrete Up To A Height Of 5 Cm. The Works Should Be Carried Out Maintaining The Continuity Of Drainage And Under Supervision Network Operators (If Required)1.4. Finishing Works And Markingthe Scope Includes:• Installation Of Point Reflective Elements (Peo),• Execution Of Horizontal Markings With White Self-Curing Mass (Structural Marking),• Installation Of The Information Board The Project Was Created Under The Citizens Budget,• Topsoiling Of Adjacent Areas Along With Sowing. The Marking Should Be Mad
|