1. The Subject Of The Order Is The Performance Of Works For The Task Titled: Expansion Of Road Lighting Powered By Renewable Sources In The Lubin Commune.1.1. The Scope Of The Task Includes In Particular: A) Construction Of 31 Street Lighting Sets (Lamps), Powered By Batteries, Charged From Photovoltaic Panels, Located According To The List Constituting Annex No. 3 To The Contract, B) Staking Out And Geodetic As-Built Inventory Of Lighting Points Covered By The Contract, C) Development And Approval Of Temporary Traffic Organization Designs, D) Placing A Sticker On Each Pole Containing, Among Others, Information About The Owner Of The Lighthouse, Its Number And Year Of Construction.1.2. The Complete Lighting Set Will Consist In Particular Of The Following Elements: 1. Conical Steel Pole With An Octagonal Cross-Section, Hot-Dip Galvanized, Additionally Powder Coated, Ral 7004 Color (Light Gray) - Height 7 M, 2. Boom, 3. Led Fixture With A Light Source Of 27-31W (Luminous Flux: Min. 3000 Lm, Temperature Light Colors 5000 - 7000K, Led Lifespan Minimum 50,000 Hours Of Operation, Krs Light Distribution Curve For Road Lighting), 4. Photovoltaic Panel With A Power Of 360-380 W Or 2 Photovoltaic Panels With A Total Power Of 360-380 W, 5. Battery(S) With A Capacity Of Min. 200 Ah, It Is Allowed To Use Two Batteries With A Capacity Of 120 Ah - Each (2X120 Ah), 6. Stainless Steel Anti-Theft Box Min. 316L, Wall Thickness Min. 2 Mm, Ip 68, Heat Dissipation, Box And Cable Seals Made With System Solutions; Installation In The Ground At A Depth Of Min. 1 M From The Upper Surface Of The Box On A Concrete Base Min. B20 Up To The Height Of The Upper Box Cover; Casing Design Enabling The Box To Be Anchored In The Surrounding Concrete Foundation. 7. Programmable Controller That Regulates Light Intensity, Including At Night (Power Reducer), 8. Battery Charging Regulator, 9. Foundation, 10. Ensuring Autonomous Operation Of The Solar Lamp For A Period Of Min. 4 Days, 8 Hours A Day.1.3. The Structure Of The Solar Lantern (Pole With Fixture On The Boom, Photovoltaic Panels And Foundation) Should Meet The Requirements For Wind Zone Iii. The Contractor Is Obliged To Provide The Ordering Party With Strength Calculations (Made By An Authorized Entity) Confirming The Above Fact Before Signing The Contract. A Detailed Description Of The Subject Of The Order For The Above Task Is The Design Documentation Provided From Swz, In Particular Stwior, Bill Of Quantities, Map Attachments. The Ordering Party Specified The Required Features Of Construction Works In The Above-Mentioned. Documents.
|