3.2 Scope Of Works Of The Subject Of The Order: The Subject Of The Order Is To Increase The Safety Of The Water Supply System Of The Stara Błotnica Commune Through A Comprehensive Renovation Of Two Drinking Water Retention Tanks In The Town Of Czyżówka, Design And Construction Of A New Reserve Tank In The Town Of Stary Kadłub And Reduction Of Water Losses In The Stara Błotnica Commune Through The Delivery And Installation Of Water Meters With Radio Overlays, Water Meter Wells, Implementation Of A Remote Reading System And Flow Meters, Water Supply Gate Valves Along With The Implementation Of A Water Supply Network Monitoring System, As Part Of The Task Entitled Improvement Of Water And Sewage Management In The Stara Błotnica Commune Through Modernization Of The Water Treatment Plant, Stage Ii And Installation Of Remote Reading Water Meters. The Investment Is Divided Into 3 Tasks: 3.2.1 Task I, Renovation Of Drinking Water Retention Tanks And Construction Of A New Reserve Tank.1. The Task Includes: 1) Comprehensive Renovation Of Two Drinking Water Retention Tanks With A Capacity Of 500 M³ Each At The Water Treatment Station (Suw) In Czyżówka, Plot No. 140104_2.0002.14/1; 140104_2.0002.12/1,2) Design And Construction Of A Storage Tank With A Capacity Of 500 M3 In Stare Kadłub, Plot No. 140104_2.0007.520/3. The Tank Will Be Used By The Ordering Party Also After The Renovation Of The Tanks At The Czyżówka Suw Is Completed.3) Design And Construction Of A Container Mobile Pumping Station For The Reserve Tank With A Set Of Pumps And Automation.4) Design And Implementation Of Connections/Installations: Water Supply, Energy, Telecommunication, Instrumentation And Control.5) Design And Implementation Of Land Development: Communication Routes, External Lighting, Fencing, Video Monitoring.2. Scope Of Work To Be Performed Under Task 11) Preparation Of Documentation Necessary To Obtain A Building Permit For A Storage Tank With A Capacity Of 500 M3, Along With The Necessary Facilities, Connections, Fittings, Devices, Accompanying Infrastructure, Etc. 2) Obtaining A Building Permit For The Above-Mentioned Project, 3) Construction Of Foundations For The Tank And Construction Of The Tank, 4) Construction Of A Container Mobile Pumping Station With A Set Of Pumps And Automation, 5) Execution Of Connections/Installations: Water Supply, Energy, Telecommunications, Instrumentation And Control,6) Development Of The Area: Communication Routes, External Lighting, Fencing, Video Monitoring,7) Renovation Of Existing Drinking Water Retention Tanks With A Capacity Of 500 M³ Each At The Water Treatment Plant In Czyżówka,8) Commissioning Of Devices,9) Conducting Training,10) Obtaining All Required Permits, Opinions, Tests, Tests, Arrangements, Notifications, Including: Obtaining An Occupancy Permit, If Required, 11) Preparation Of The Required As-Built Documentation Together With An As-Built Inventory, 3.2.2 Task Ii Replacement Of Water Meters With Water Meters With A Remote Re
|