|
I. Description Of The Subject Of The Order: The Subject Of The Order Is: Reconstruction Of Forest Road No. 5 In The Dąbrowa Forest District - Stage I. The Scope Of Works Includes The Reconstruction Of The Existing Road Mark Consisting Of The Implementation Of A 25 Cm Thick Frost Protection Layer - The Existing Soil Stabilized With A Hydraulic Binder Or Cement, A 25 Cm Thick Crushed Aggregate Sub-Base Made Of 0/63 Mm Aggregate Fraction And A 10 Cm Thick Driving Layer Made Of 0/31.5 Mm Fraction Aggregate With Grinding On Plots 358, 359, 362, 363, 367, 366, 365, 395, 396, 403, 404 Located In The Registration Unit 060704_2 Gościeradów Commune, District 0004 Gościeradów Folwark On Land Owned By The State Treasury Managed By Pgl State Forests, Gościeradów Forest District. Exits From Municipal Roads Will Be Rebuilt On Plot 407 Located Within The Cadastral Area 0023 Wymysłów, 060702_5 Annopol Commune And On Plot 185 Located Within The Geodetic Area 0004 Gościeradów Folwark, 060704_2 Gościeradów Commune. Ii. Scope Of Worksconcerns The Reconstruction Of Forest Road No. 5 In L. Dąbrowa On Plots No. 358, 359, 362, 363, 367, 366, 365, 395, 396, 403, 404. As Part Of The Planned Reconstruction, A 1+560 M Long Road Lane, 3.5 M Wide, With Dirt Roadsides On Both Sides Will Be Created. (Sand + Aggregate Mixture, Minimum Density Is Is-0.98) With A Width Of 0.75 M, Passing Areas (6 Pieces), Widenings On Horizontal Curves (1 Piece), Transverse Channels (2 Pieces) And Exits To Side Roads (12 Pieces). The Development Project Covered The Existing Road Footprint And, In Some Places, The Area Located Nearby In The Event Of Correction Of The Existing Route And In The Case Of Locating Passing Areas And Exits To Side Roads Required By Fire Regulations. Construction Works Include: - Marking Out The Road In The Field, - Removing The Remaining Topsoil From The Road And In The Immediate Vicinity Of The Road, - Grubbing Up Tree Trunks With An Excavator, Including Their Removal And Management, And Cleaning Slopes, Roadsides From Existing Bushes And Existing Trees - Construction Of Embankments And Excavations, Along With Removal Of Excess Spoil - Mechanical Profiling And Compaction Of The Subsoil (Existing Road Structure) Along With Corrections Situational And Height-Wise, - Execution Of Transverse Grits, - Stabilization Of The Substrate With Cement Or Hydraulic Binder 9241 M2, 25 Cm Thick, - Execution Of A Foundation Layer Of Crushed Aggregate Fraction 0-63 Mm, Thickness 20 Cm, - Execution Of A Pavement Layer Of Crushed Aggregate Fraction 0-31.5 Mm, Thickness 10 Cm With Grinding (It Had Fractions 0-4 To 0-8), - Construction Of Exits To Side Roads And Passing Passages Required By Regulations, With A Structure Similar To The Main Road, - Construction Of Roadsides Made Of A Mixture Of Minerals (Sand + Aggregate) 10 Cm Thick. This Applies To The Reconstruction Of Exits From Municipal Roads On Plot 407 Located In The Cadastral Area 0023 Wymysłów, 060702_5 Annopol Commune And On Plot 185
|