1. The Subject Of The Order Is: Renovation Of Balcony Slabs Of The Building At Ul. Armii Krajowej 31.2. List Of Activities: 1) Preparatory And Demolition Works: Washing The Ceilings Of Balcony Slabs Using Cleaning Agents To Remove Dirt. Dismantling All Floor Layers Of The Balcony Slab, Cleaning The Slab From Dust And Dirt. Partial Demolition (Removal) Of The Façade Insulation Layer In The Scope Of The Planned Extension Of The Insulation From The Felt Onto The Building Wall. Protecting Windows With Foil. Assembly, Disassembly And Protection Of Scaffolding, 2) Checking The Correct Slopes Of The Balcony Slab And Making A Slope Layer Of Cement Floor (M.80) Thick. 20-30 Mm,3) Implementation Of A Moisture-Proof Insulating Coating Made Of Bituminous Emulsion On The Balcony Floor,4) Installation And Gluing Of Flashings On The Edges Of Balconies From Prefabricated Elements Made Of Galvanized, Coated Sheet Metal. Min. 0.55 Mm, 5) Insulation Made Of Thermally Weldable Felt In A Single Layer With A Fold On The Wall, Min. 30 Cm. Roof Felt Parameters: Roofing Felt, Min. Thickness. 5.2 Mm, Matrix Type Polyester Fibers 250 Gr/M2, Longitudinal Break 1000N/5 Cm, Transverse Break 800N/5 Cm, Waterproofness 200Kpa,6) Construction Of Cement Floor With Mortar M.80 Gr. 10 Cm. Priming The Substrate For Laying Ceramic Tiles, 7) Making Floor Coverings With 15 Cm High Plinths Made Of Ceramic Tiles - Technical Stoneware Laid With Highly Flexible Adhesive, Dimensions Ranging From 30 X 30 Cm. Minimum Requirements For Tiles: Frost Resistance, Grade 1, Abrasion Class Min. 3, Anti-Slip Min. R10,8) Sealing The Floor Butt With A Waterproof, Highly Elastic Mass,9) Replacing The Broken Insulation - Polystyrene Plus Thin-Layer Plaster,10) Manual Or Mechanical Cleaning Of The Old Balustrade Paint Using Wire Brushes. Checking The Attachment Of Vertical Balustrade Elements To System Brands In Balcony Slabs. Making (Welding) Reinforcing Inserts Made Of Steel Flat Bars - If Excessive Corrosion Is Found, 11) Hand-Painting The Balustrades With Chlorinated Rubber Enamel Twice In Gray, 12) Priming The Ceilings Of The Balcony Slabs For The Application Of A Coating Of Facade Paint. Partial Repair Of The Surface Of Peeling And Damp Ceiling Coating. Painting The Ceilings Of Balcony Slabs With Silicone Facade Paint Twice. The Colors Of The Façade Are Adapted To The Existing One,13) Delivery And Assembly Of A Roofing Structure For The Top-Floor Balconies, Made Of Galvanized Steel Sections (Closed, Thin-Walled Profiles) With A Cellular Polycarbonate Covering. The Method Of Execution And Assembly Should Be Agreed With The Ordering Party, 14) Removal Of Rubble, Disposal Of Demolition Building Materials, Clean-Up Of The Area, Restoration Of Existing Greenery Within The Scope Of Use Of The Area, 15) Other Construction Works Commissioned By The Ordering Party, The Execution Of Which Is Necessary To Ensure The Proper Performance Of The Above-Mentioned Works. 3. A Detailed Description Of The Subject Of The
|