|
The Subject Of This Order Are Construction Works Consisting In The Reconstruction Of Electrical Installations In The Building Of The Secondary School. Władysław Jagiełło In Krasnystaw. The Purpose Of The Order Is To Ensure The Proper Technical Condition Of The Facility, Improve The Safety Of Users, Ensure Compliance Of The Facility With Applicable Technical And Construction Regulations, In Particular With The Provisions Regarding Accessibility For People With Disabilities, As Well As To Increase The Durability Of The Material And Technological Solutions Used. The Scope Of The Subject Of The Order Includes In Particular The Following Works: Installation Of A Fire Protection Switch, Replacement And Installation Of Additional Electrical Switchboards, Excluding Switchboards In The Boiler Room, Server Room And It Room 311 And 312 That Remain Existing, Installation Of An Electronic Compensator For Reactive Power And Higher Harmonics, Connection Of The Photovoltaic Installation To The New Rg Switchgear, Replacement And Installation Of New Internal Power Lines, Installation Of A New Emergency Lighting Installation With Central Monitoring, Supplementing The Basic Lighting Installation With Lighting Fixtures With Missing Or Unreplaced Incandescent Fixtures, Installation Of Additional, Autonomously Controlled Lighting Fixtures In School Blackboard Areas, Replacement With New Ones Wiring Of The Basic Lighting Installation, Excluding The Boiler Room Room, Where The Existing Wiring Remains. Replacement Of The Plug Socket Installation, Excluding The Boiler Room Room, Where The Existing Installation Remains, Replacement Of The Wiring Of The Structural Network Installation, Excluding It Laboratories 311 And 312, Where The Existing Installation Remains (The Connection Between The Above-Mentioned Workshop And The Server Room Is Subject To Replacement), Replacement Of The Wiring Of The Following Installations: Voice Broadcasting (Radio Node), School Bell, Sswin,Installation Of Wiring For Closed-Circuit Television (Vss),Installation Of Earthing Installation And Equipotential Bonding,Replacement Of The Entire Lightning Protection Installation With Installation Of A New Ring Earthing Device,Construction Of The Rg Switchgear Room Along With Installation Of Air Conditioning Installation,Installation And Installation Of Cable Routes,Replacement Of Doors To The Boiler Room,Marking Of Electrical Installations And Fire Protection Devices,Seals Of Installations In Partitions Fire Protection. Disassembly Of Decommissioned Equipment And Waste Management, Other Work Necessary For The Proper Performance Of The Task, Including Preparatory Work, Cleaning, Securing The Construction Site, Setting Up Scaffolding, Etc.
|