As Well As The Turning Area And Control Area Inside The Bjørnfjell Plowing Station. Surplus Materials Must Be Used For The Improvement Of Side Terrain, Approx. 10 Km From Trollvann Towards Skitdalshøgda/Sirkelvann. Good Masses, Such As Old Reinforcement Layers, Are Taken Care Of And Used In E.G. Substructures. Blasting Work: To Make Room For The Column Arrangement, Approx. 2600 Pfm3. It Is Located High Voltage In The Immediate Vicinity Of Rock Carving And 4-5 Cabins Within 100 Metres. There Is A Hydropower Tunnel At The Outer Edge Of The Measure Area (See Note From Rambøll, Assessment Of Vibration Control Measures). Stormwater Management: Existing Gutter Through E10 To Be Replaced. Storm Water From The Parking Area Is Led Through A New Storm Water Line. And Storm Water Lines Must Be Laid, Approx. 150 Metres, As Well As Sand Traps And Drains At The Control And Turning Point. Electrical Work: Establishment Of Road Lighting System And Column Installation, As Well As Lighting Of The Control Area/Turning Area. A Technical Building For Electrical Switchboards Will Be Established. New Road Lighting System And Controls For Road Barriers, Boards And Cameras Are To Be Moved From The Old Technical Building Into The Same Technical Building.
Contact Information
Address
Statens Vegvesen ,Skoggata 19 ,1500 ,Moss ,Norway
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111885027
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.