Construction Work – Conversion Of B1 Stops, Traffic Signals. Main Masses: -Delivery And Assembly Of Sub-Distribution & Components Container 3 Pieces. -Installation Of Indoor System Fsa Container 3 Pieces. -Assemble The Cable Splitter Cable Splitter Mounting Plate For The Zub Loop Amplifier And Wire The Mounting Plate, Test And Put It Into Operation 5 Pieces. -Assemble/Convert The Rail Foot Holder, Install The Switching Point And Connect It On Both Sides 47 Pieces Pcs. -Dismantle Vehicle Detectors 3 Pcs. -Assemble, Convert And Put Into Operation Driving And Turnout Position Signals 16 Pcs. -Dismantle Driving And Turnout Position Signals 12 Pcs. -Connect Turnout Drives And Put Them Into Operation 8 Pcs. - Plan Technical Column Assembly Board, Deliver And Assemble Components, Wire And Put Them Into Operation 5 Pcs. - Implement Technical Pillar Assembly Board 2 Pcs. - Measuring Track Elements And Train Protection Components 1 Psch. -Test Report According To Din Vde 1 Psch. -Documentation Of The System Structure 1 Psch. -Acceptance Testing And Commissioning 1 Psch.
Contact Information
Address
Viktoriastraße 15
Contact No.
023150
Email
ycirak@stadtdo.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111838449
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.