1. The Subject Of The Order Includes The Reconstruction Of Ul. Poniatowskiego In Knurów, I.E. An Internal Municipal Road With A Length Of Approx. 250 Meters Along With The Reconstruction Of A Fragment Of Ul. Słoniny (Approx. 50 Meters), Including: 1) Road Surface Made Of Asphalt Concrete, Thickness: 10 Cm Together With The Substructure, 2) Construction Of The Surface Of The Exits From Concrete Paving Stones, Thickness. 8 Cm Including The Substructure, 3) Construction Of Sidewalks And Hardened Roadsides With Concrete Paving Stones, Thickness. 8 Cm Including The Substructure, 4) Construction Of A Storm Sewage System, Including: A) Sewage System Made Of Ø 400 Pipes, B) Sewage System Made Of Ø 325 Pipes, C) Sewage System Made Of Ø 250 Pipes, D) Sewerage Made Of Ø 200 Pipes, E) Concrete Sewage Wells With A Diameter Of Ø 1200, F) Concrete Street Gullies With A Diameter Of Ø 500 Sedimentation Tank And Basket, 5) Traffic Organization Markings For The Duration Of The Works In Accordance With The Approved Traffic Organization Design Provided By The Ordering Party And Removal Of The Above-Mentioned. Markings After Acceptance Of The Target Traffic Organization, 6) Marking Of The Target Traffic Organization In Accordance With The Approved Traffic Organization Design Provided By The Ordering Party, 7) Accompanying Works (Earthworks, Demolition, Preparatory And Cleaning Works, Securing Existing Cables With Protective Pipes, Adjustment Of Manholes, Height Adjustment Of Existing Underground Facilities, Construction Of Lawns, Restoration Of Surfaces And Lawns (Topsoil With Grass) Damaged During The Works, Protection Of Trees For The Duration Of The Works Works, Etc.). 2. The Detailed Scope Of The Order Is Determined By: Design Documentation And Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities And Arrangements Resulting From The Contract Template. The Contractor Is Obliged To Read The Swz And Its Annexes And Complete The Order On The Terms And Conditions Described Therein. 3. The Ordering Party Allows The Use Of Equivalent Devices And Materials Wherever The Design Documentation Describes The Subject Of The Order Using Trademarks, Patents Or Origin, Source Or A Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor. 4. The Types Of Devices, Catalog Cards, Descriptions, Drawings And Names Of Manufacturers Should Be Treated As Examples. 5. All Parameters, Including Technical, Operational And Operational Parameters Of Devices And Materials Used By The Contractor In The Execution Of The Order Must Meet The Requirements Indicated In The Swz And Its Annexes. Changing Any Of The Devices, Elements, Materials, Etc. Should Take Into Account All Technical Parameters That Are Important From The Point Of View Of The Operation Of The Facility As A Whole, As Well As Specific Architectural And Construction Restrictions And Land Development. 6. The Contractor Will Be Obliged To Provide A Quality Guarantee F
|