|
1. The Subject Of The Order Is The Construction Of The Intersection Of District Road No. 1005C With Municipal Road No. 010206C In Śliwice.2. This Public Procurement Constitutes The Second Stage Of The Investment. Due To The High Cost Of The Investment (In Accordance With The Zrid Decision) And Improved Safety At The Road And Rail Crossing, It Was Decided To Introduce Changes That Are Not Significant In Relation To The Construction Design. All Changes In The Design Documentation Are Insignificant If No Changes Are Made That Result In A Change Of The Environmental Decision Or The Water Law Decision. The Investor Agreed Again With Pkp To Approve The Replacement Development Project. In 2025, The Following Were Completed: • Road Embankment For The Intersection And The Bicycle Footpath, • Lower Foundation Made Of Aggregate 0-63 At The Intersection And The Bicycle Footpath, • Dirt Roadsides And Cleaning Works, Profiling Of Slopes And The Crown Of The Embankments.3. Scope Of Works Covered By This Procedure: 1) Execution Of The Basic Sub-Base With Kłsm At The Intersection And The Bicycle Pedestrian Path: Leveling Of The Kłsm 0-31.5 Gr 5 Cm Sub-Base Made In 2025, 2) Execution Of A Wearing Course On The Pedestrian And Bicycle Path 5 Cm Thick, 3) Execution Of A Binding Layer At The Intersection, 4) Execution Of A Wearing Course At The Intersection, 5) Installation Of Concrete Elements, I.E. Curbs Concrete And Edges,6) Making A Strip Of 8 Cm Thick Concrete Cubes,7) Making Roadsides With Kłsm At The Intersection,8) Making Vertical And Horizontal Markings,9) Installing Traffic Safety Elements,10) Making A Pavement With Granite Cubes.4. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Approved By The Decision To Authorize The Implementation Of The Road Investment Constituting Annex No. 4 To The Swz, The Bill Of Quantities Constituting Annex No. 6 To The Swz, As Well As In The Technical Specifications For The Execution And Acceptance Of Construction Works, Constituting Annex No. 5 To The Swz.5. The Contractor, Without Additional Remuneration, Undertakes To: 1) Perform All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Provide An Energy Connection For The Needs Of The Construction Site And Bear The Costs Of Their Consumption, 2) Mark And Secure The Construction Site, 3) Bear All Costs Of Research, Expert Opinions And Opinions Necessary To Assess The Quality Of The Works And Proper Performance Of The Subject Of The Order, 4) Bear The Costs Related To The Acceptance Of The Completed Works, 5) Prepare A Traffic Management Project For The Duration Of The Works Before Entering The Construction Site, 6) Updating The Permanent Traffic Organization After The Construction Of The Investment On The Contractors Part, 7) In The Event Of Damage To Devices Or Their Parts (Including Water And Sewage Systems, Electricity, Electrical Engineering, Drainage Devices And Municipal Roads) Duri
|