|
The Subject Of The Order Is The Construction Of A Road In Długie, 242 M Long, Along With The Reconstruction Of Road No. 112403L Ul. Grabowa In The Town Of Turka. Listed Below Are The Main Features Of The Item And Approximate Quantities:1. Road Works: - Length Of The Internal Road Approximately 242 M, - Width Of The Bitumen Road Of The Internal Road 5 M, - One-Sided Sidewalk Made Of Concrete Paving Stones On The Internal Road, Width Of Approximately 2.3 M, - One-Sided Sidewalk Made Of Concrete Paving Stones At Ul. Grabowa, Approximately 505 M Long, 1.80 M Wide And 2.55 M High, - Parking Bay Made Of Concrete Paving Stones For 10 Vehicles At Ul. Grabowa, - Construction Of Individual Exits Made Of Paving Stones, - Connection To A Municipal Public Road, - Construction Of Vertical And Horizontal Markings, Including Construction Of Raised Pedestrian Crossings, - Dismantling Of The Road Slab Surface And Transport Of The Slabs To The Place Indicated By The Ordering Party, Up To 10 Km Away, Including Unloading, - Partial Renovation Of The Bituminous Surface Of Ul. Grabowa At The Intersection With The Municipal Road In The Place Of The Planned Sidewalk And Pedestrian Crossing In Order To Eliminate The Depression Collecting Water And Drain It Along The Street. Grabowa (Milling And Reconstruction Of Bitumen Surface) Approximately 90 M2.2. Sanitary Industry - Storm Sewage System: - Dn300 Rainwater Channels With A Total Length Of L = 218.8 M, - Dn350 Rainwater Channels With A Total Length Of L = 3.3 M, - Dn2000 Absorption Wells, 2 Pieces, - Dn1200 Sewerage Wells, 10 Pieces, - Dn1400 Sewerage Wells, 1 Piece, - Rainwater Separator , 1 Pieces, - Dn200 Drains From Rainwater Inlet Wells, Total Length L = 34.5 M, - Dn500 Inlet Wells With Inlets, 9 Pieces, - Height Adjustment Of Existing Sanitary Sewage Wells (Including Replacement Of Manholes And Relief Rings, Also Applies To The Sidewalk At Grabowa Street) And Height Adjustment Of Water Supply Gate Valves (Including Replacement Of Casings Telescopic, Also Applies To The Sidewalk At Ul. Grabowa), Return Of Old Materials To The Ordering Party (Relief Rings, Manholes, Valve Housings). Note: One Additional Well In A Separate Drawing; - Reconstruction Of The Hydrant On The Sidewalk At Ul. Grabowa, - Camera Recording Of The Constructed Stormwater Drainage Network.3. Electrical Industry: - Removal Of Collisions Of 0.4Kv Power Cables (Construction Of Cable Lines With A Total Length Of Approximately 97 M, Installation Of Two-Part Protective Pipes On Existing Cables, A Total Of Approximately 109 M), - Construction Of Road Lighting (Power Supply From The Existing Pole, Construction Of A Lighting Cable Line With A Route Length Of 273 M, Including Some In Protective Pipes, Construction Of 9 Steel Lighting Poles With Led Fixtures 10Pcs).4. The Subject Of The Order Also Includes: - Preparation Of A Temporary Traffic Organization Project At The Contractors Own Expense And Approval Thereof In Accordance With Applicable Regulations B
|