|
1. The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Connector Between Janusza Korczaka Street And Ul. Gen. Józef Haller In Gorlice Along With Obtaining An Occupancy Permit. The Subject Of The Order Includes, Among Others: The Following Works: 1) Road Construction In The Following Scope: A) Traffic Organization For The Duration Of The Works, B) Preparatory Works And Demolition Of Existing Street Elements, C) Earthworks, D) Construction Of A 2X3 M Asphalt Road, Approx. M, G) Construction Of Roadsides And Fences With A Width Of 1.0 - 1.5 M And A Length Of Approx. 248.4 M, H) Construction Of Public Exits - 6 Pcs., I) Construction Of Individual Exits, J) Construction Of Pedestrian Crossings, K) Construction Of A Retaining Structure, L) Construction Of A Safety Net, M) Construction Of Vertical And Horizontal Markings.2) Construction Of A Rainwater Drainage System In The Following Scope: A) Pvc Fi Collector 500 Approx. 112 Mb, B) Pvc Collector Fi 400 Approx. 15 Mb, C) Pvc 315 Collector Approx. 267 Mb, D) Pvc Collector 250 Fi Approx. 70 Mb, E) Pvc Collector 200 Approx. 78 Mb, F) Manholes Fi 1500 - 1200 - 23 Pcs., G) Manholes Fi 500 - Approx. 21 Pcs., H) Retention Tanks - 2 Pcs., I) Concrete Collector Fi 800, Approx. 26 M, J) Concrete Collector Fi 600, Approx. 2 M, K) Concrete Collector Fi 500, Approx. 20 M.3) Construction Of The Water Supply Network In The Following Scope: A) Dn 110 With A Length Of Approx. 156 Meter, B) Dn80 Hydrant. 4) Reconstruction Of The Low And Medium Pressure Gas Network In The Following Scope: A) Pe 90 Pipe, Approx. 46 M, B) Pe 125 Pipe, Approx. 22 M, C) Pe 180 Pipe, Approx. 141 M, D) Pe 250 Pipe, Approx. 67 M. 5) Construction Of The Lv Network In The Following Scope: A) Dismantling The Overhead Network, B) Construction Of The Overhead Network And Cable. 6) Construction Of The Mv Network In The Following Scope: A) Dismantling The Mv Overhead Network, B) Construction Of The Mv Overhead And Cable Network. 7) Construction Of A Lighting Network In The Following Scope: A) Construction Of Street Lighting (7 Poles) Along With Illumination Of Pedestrian Crossings.8) Construction Of A Technological Channel With A Total Length Of Approx. 349 M.9) Planting In The Following Scope: A) Trees To Be Planted - 12 Pcs., B) Shrubs To Be Planted - 100 Pcs.2. A Detailed Description Of The Subject Of The Contract Is Set Out In The Documentation Below: 1) Land Development Design - Update 2023 - Annex No. 1 To The Swz, 2) Land Development Design - Update 2024 - Annex No. 2 To The Swz, 3) Architectural And Construction Design - Update 2023 - Annex No. 3 To The Swz, 4) Architectural And Construction Design - Update 2024 - Annex 4 To Swz,5) Formal And Legal Documents - Update 2023 - Annex No. 5 To Swz,6) Formal And Legal Documents - Update 2024 - Annex No. 6 To Swz,7) Technical Design - Annex No. 7 To Swz,8) Technical Specifications For The Execution And Acceptance Of Construction Works - Annex No. 8 To Sw
|