4.1 The Subject Of The Order Is The Renovation Of The Facade Of The Building Of The Municipal Office In Ożarów Mazowiecki At Ul. Kolejowa 2, The Investment Is Located On Plots No. 189/16, 189/15, 189/14, 189/10, District 0008, Unit. Ew. 143206_4 Ożarów Mazowiecki.4.2 A Detailed Description Of The Scope Of The Subject Of The Order Is Included In The Description Of The Subject Of The Order - Annex No. 1.1-1.3, Which Consists Of: 1) Façade Renovation Project - Annex. 1.1 To Swz, 2) Bill Of Quantities - Annex. No. 1.2 To Swz,3) Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb) - Annex. No. 1.3 To Swz.4.3 The Arrangements Contained In The Technical Specification Include General Requirements Common To The Works Covered By The Specifications Listed Below: 1) Architecture And Construction: - Preparatory Works, - External Plasters, - Facade Works - Painting Thread, - Facade Works - Clinker Tiles Thread, 2) Surface Hardening: - Bed With Profiling And Compaction Of The Substrate, - Cobblestone Surface Concrete, 4.4 The Scope Of The Subject Of The Order Includes, Among Others: 1) Preparatory Works, In Particular: A) Separating And Securing The Construction Site And Storage Areas For Building Materials, Using Protective Nets And Tarpaulins On The Scaffolding, According To A Previously Prepared Design For The Organization Of The Construction Site, Agreed With The Ordering Party, B) Marking The Area And Carrying Out Protective Works In Accordance With Bioz Guidelines, C) Ensuring The Organization Of The Transport Of Construction Materials And Access To The Building Being Constructed In A Manner That Does Not Harm The Previously Completed Works, D) Provision Of Electricity And Water To Power The Construction Site (Signing And Financing Appropriate Contracts), E) Preparation Of Social Facilities For The Construction Site, F) Protection Against Damage To The Greenery Around The Building, G) Cleaning Of The Construction Site, Removal Of Construction Waste, H) Development Of Temporary Traffic Organization For The Duration Of Construction, 2) Renovation Works, In Particular: A) Dismantling Of Elements Installed On The Façade For The Duration Of The Renovation, B) Securing Windows, Doors, The Area Around The Building And Elements Such As Grates During Renovation, C) Renovation Works Regarding Clinker Tile Cladding And Clinker Brick Columns, Including: - Cleaning Of Clinker Tile Cladding And Clinker Brick Cladding, - Removal Of Microbiological Contamination (Fungi, Algae, Lichens, Molds), - Removal And Repair Of - Damages And Defects In Clinker Tile Cladding (Including Replacement Of Clinker Tiles -20/30%) - Replacement Of Joints In Clinker Bricks And Clinker Tiles, - Impregnation Of Clinker Tiles And Clinker Bricks. D) Renovation Works Of Plaster Above The Plinth, Including: - Cleaning Of External Walls - With A Low-Pressure Washer, Removal Of Microbiological Contamination (Fungi, Algae, Lichens, Molds), - Removal Of Damages, Cra
|