The Subject Of The Order Is The Design, Construction, Delivery And Assembly Of A Ground-Based Photovoltaic Installation With An Installed Capacity Of Up To 500 Kw Along With The Necessary Technical Infrastructure At Zakład Gospodarki Odpadami S.A. In Bielsko-Biała, Obtaining The Necessary Permit Opinions And Connection To The National Electricity System, Launching And Obtaining Formal And Legal Documentation Required By Applicable Regulations, Necessary For The Operation Of The Res Installation And Signing An Indefinite Contract For The Receipt Of Electricity By The Electricity Distribution Company. The Task Is Carried Out As Part Of The Project Entitled: Ground-Mounted Photovoltaic Installation With A Capacity Of Up To 500 Kw Along With The Necessary Technical Infrastructure. The Investment Area Is Located In The Silesian Voivodeship, Bielsko-Biała County, Bielsko-Biała Commune. The Planned Investment Is Located In The City Of Bielsko-Biała, Plot No.: 3212/12, 3274/7, 3287/3, 3287/7, 3287/8, 3287/11, 3287/12, 3340/16, 3340/17, 3340/19, 3340/25, 3340/26, 3340/27, 3411/13, 3411/20, 3412/11, 3415/28, 3415/31, 4714/2, 4714/6, 4714/7 Within 0032, In The Registration Unit 246101_1 Bielsko-Biała. The Scope Of The Subject Of The Order Includes In Particular: - Surveying Works And Preliminary Works Necessary To Be Performed Before Designing; - Design Works, Obtaining All Permits And Consents Required By Law, Including Building Permit Decisions; - Preparatory Works, I.E. Works Necessary To Be Carried Out In The Field Of Investment Preparation (Earthworks - Leveling The Ground Along With Filling In Holes And Unevenness And Other Necessary Tasks), Preparation Of Construction Facilities And The Construction Site, Taking Into Account The Protective Layer And Specifics Waste Landfill; - Construction Of A Complete Photovoltaic Farm, Including Delivery, Assembly And Connection To The National Power System Of A Photovoltaic Farm With A Total Capacity Of 500 Kw, Along With Commissioning And Obtaining Formal And Legal Documentation Required By Applicable Regulations, Necessary To Launch And Operate The Photovoltaic Farm; - Performing All Tests, Final Tests And Commissioning Of The Photovoltaic Installation Required To Sign An Indefinite Contract For The Reception Of Electricity By An Energy Distribution Company Electricity - Development Of The Investment Area And Restoring It To Its Original Condition; - Handing Over The Completed Works To The Ordering Party For Operation. The Scope Of Design Works Includes Execution In Accordance With The Provisions Of The Act Of July 7, 1994 Construction Law (Journal Of Laws Of 2025, Item 418, As Amended). Announcement Of The Marshal Of The Sejm Of The Republic Of Poland Of March 6, 2025 On The Publication Of The Consolidated Text Of The Construction Law Act: - Land Development Design, Architectural And Construction Design, Technical Design And Obtaining All Necessary Arrangements, Decisions And Permits; - As-Built Documentation
|