|
Reconstruction Of The District Road, Construction Of A Sidewalk In Wyśmierzyce, Ul. Kopernika, Construction Of A Sidewalk On A Section Of 271.00 M, Cutting And Grubbing Up Trees With A Diameter Of Up To 35 Cm 5.0 Pcs., Demolition Of The Ba Surface, Gr. 4Cm 3.00 M2, Demolition Of Aggregate Foundation Thickness. 15Cm. 3.00 M2, Disassembly Of Posts And Shields Of Vertical Signs ½ Pcs., Demolition Of Curbs 104.00 M, Construction Of A Trough Depth. 10/30/35Cm, Total Area: 690.00 M2, Sewage Ducts Made Of Pvc Pipes With A Diameter Of 160Mm 7.50M, Construction Of Sewage Wells With A Diameter Of 50Cm With A Settling Tank 3.00 Sets, Construction Of A Drainage System From 16.00 M3 Boxes, Drainage Layer Made Of Sand, Thickness. 10Cm 493.00M2, Substructure Made Of Crushed Aggregate 0/31.5Mm Thick. 15Cm 140.00M2, Thickness 25Cm 2.00M2, Base Made Of Gsc 2.5 Mpa Thick. 351.00 M2, Bituminous Works, Ac 8S Grit. 3Cm 2.00 M2, Bituminous Works, Binding Ac16w, Thickness 6Cm 2.00 M2, Installation Of Thick-Layer Horizontal Markings 3.60 M2, Installation Of Sign Posts 2.00 Pcs., Installation Of Sign Boards 4.00 Pcs., Installation Of A 15X30 Cm Curb On A Concrete Bench. C12/15 With A Resistance Of 104.00 M, Placing Concrete Edges 30X8 Cm On A Cement-Sand Base. Gr. 3Cm 273.00M, Surface Made Of Gray Paving Stones, Thickness. 6 Cm On A Cement-Sand Ballast, Thick. 3 Cm 351.00 M2, Surface Made Of Colored Paving Stones, Thickness. 8 Cm On A Cement-Sand Ballast, Thick. 3 Cm 140.00 M2, Construction Of The Exit Surface From Crushed Aggregate 0/31.5 Mm Thick. 15Cm 199.00M2, Adjustment Of Water Supply Valves 3.00 Pcs.
|