|
Discount On The Catalog Of Parts, Equipment And Miscellaneous First-Line Original Accessories. Reference Of The Brands Ebara, Leão, Shreider, Intech, Anauger, Dancor For Submersible Pumps And Panels. Whoever Presents The Greatest Discount On The Manufacturers List Price Will Be Considered The Winner, With The Presentation Of The Table In Force During The Financial Year., Drilling A Tubular Well, 6 Diameter, With A 6 Diameter Casing, Using A Geomechanical Casing. Starting Drilling With A Diameter Of 8” In The Part Of The Sediment, Which Is Covered With An 8” Geomechanical Tube, Finding The Crystalline Rock, Drilling Will Continue At 6”, With No Further Need To Line The Well, Continuing In This Way Until The Agreed Depth, Finding The Fractures With Water Up To The Estimated Flow Rate.), Cleaning Of The Artesian Well (After Completion Of Drilling The Well Requires Cleaning, Also Using Appropriate Equipment, Since Lubricants Are Used In The Drill, Leaving A Residue That Needs To Be Removed, As Well As Fractures In The Rocks Produce Materials (Sand, Mud, Etc.) That Need To Be Removed, This Service Has An Execution Period (Hours) That Varies Depending On The Amount Of Existing Material. Wells That Have Already Been Drilled, After A Certain Period Of Use, The Materials Produced By The Fractures Of The Rocks Are Also Removed, Thus Improving Water Quality.), Assembly And Disassembly Of The Pipeline Network (Consists Of Removing And Reinstalling The Piping That Threads Onto The Pumping Equipment Inside The Well For Verification/Analysis And/Or Repair And Maintenance Thereof.), Assembly Of The Pipeline Network And Water Distribution (Installation And Implementation Of Water Distribution Networks.), 04/14/2026 - 09:53:39, Maintenance Of Water Mains And Distribution Networks (Consists Of The Recovery/Maintenance/Repair Of Water Distribution Networks.), Replacement Of Artesian Well Lining (Consists Of Changing/Replacing The Lining Pipe 8” Of The Artesian Well Which Is Rusted (Iron) And/Or Broken (Pvc), On The Other Of The Same Diameter With Pvc Material, Preventing The Entry Of Materials (Earth, Mud, Stone, Etc.) Into The Well, Sometimes Obstructing It.), Inspection And Maintenance Of Control Panels (Consists Of Checking/Maintaining/Repairing Them Control Panels That Activate/Deactivate And Serve As Protection (Electrical Part) Of The Electric Pumps, Avoiding Further Damage.), Inspection And Maintenance Of Pumping Equipment (Consists Of Checking/Maintaining/Repairing The Pumping Equipment, Which May Have Been Damaged, Proceeding (If Necessary) To Replace The Internal Parts As Well As Internal Cleaning Of The Same, Optimizing Its Flow.), Well Flow Test (After Completion Of Drilling The Well And After Cleaning, Also Using Appropriate Equipment (Lower Pressure Air Compressor), The Flow Test Is Performed With The Purpose Of Identifying The Static Level (Ne) And Dynamic Level (Nd), As Well As The Real Flow Of The Well Which Will Serve As Concrete Information For The Future Installation Of The Well. This Service Has A Varying Execution Period (Hours), Depending On The Time Taken To Lower The Water Level Until It Stabilizes. Wells That Have Already Been Drilled, After A Certain Period Of Use, Are Also Carried Out With The Purpose Of Measuring The Current Flow Situation. Galvanized Sheet, With Pair Reopenings
|