|
Preventive Maintenance – Air Conditioning 7,000 Btus, Preventive Maintenance – Air Conditioning 7,500 Btus, Preventive Maintenance – Air Conditioning 9,000 Btus, Preventive Maintenance – Air Conditioning 9,500 Btus, Preventative Maintenance – Air Conditioning 10,000 Btus, 04/14/2026 - 13:10:00, Preventative Maintenance – Air Conditioning 12,000 Btus, Preventive Maintenance – Air Conditioning 18,000 Btus, Preventive Maintenance – Air Conditioning 24,000 Btus, Preventative Maintenance – Air Conditioning 30,000 Btus, Maintenance Preventive – Air Conditioning 36,000 Btus, Corrective Maintenance – Air Conditioning 48,000 Btus, Preventive Maintenance – Air Conditioning 60,000 Btus, Corrective Maintenance – Air Conditioning 7,000 Btus, Corrective Maintenance – Air Conditioning 7,500 Btus, Corrective Maintenance – Air Conditioning 9,000 Btus, Corrective Maintenance – Air Conditioning 9,500 Btus, Corrective Maintenance – Air Conditioning 10,000 Btus, Corrective Maintenance – Air Conditioning 12,000 Btus, Corrective Maintenance – Air Conditioning 18,000 Btus, Corrective Maintenance – Air Conditioning 24,000 Btus, Corrective Maintenance – Air Conditioning 30,000 Btus, Corrective Maintenance – Air Conditioning 36,000 Btus, Corrective Maintenance – Air Conditioning 48,000 Btus, Corrective Maintenance – Air Conditioning 60,000 Btus, Preventive Maintenance On Air Conditioners, Semi-Annually, With Technicians Specialized, In All Equipment Of The City Hall Of Luís Eduardo Magalhães (Without Supply Of Parts And Accessories)., Corrective Maintenance In Air Conditioners, As Needed, Preventive Maintenance In Air Curtains, With Specialized Technicians, Corrective Maintenance In Air Curtains, In All Equipment Of The City Hall Of Luís Eduardo Magalhães Magalhães. (No Supply Of Parts And Accessories)., Estimated Balance For Replacement Of Damaged/Burned Parts, Unrelated Supervening Services. The Contractor Will Issue A Technical Report Attesting To The Need And List Of Parts To Be Replaced, In Addition To 03 (Three) Budgets With Market Values, Of The Items To Be Acquired By The Administration, Aiming To Meet The Needs. (The Total Unit Value Cannot Be Changed In The Initial And Realigned Proposal., Installation Of An Air-Conditioning Unit, Split Type, Of 9,000/12,000 Btus (With Piping Up To 3 Meters)., Of 18,000/24,000 Btus (With Piping Of Up To 3 Meters). 3 Meters)., 48,000/60,000 Btus (With Piping Up To 3 Meters)., Air Piping 9,000 Btus (Copper (1/4 And 3/8), Pp Cable 4X2, 5 Thermal Insulating Sponges And Pvc Tape)., Air Piping 12,000/18,000 Btus (Copper (1/4 And 3/8), Air Piping 24,000 Btus (Copper (5/8 And 1/4), Air Piping 30,000/36,000 Btus (Copper (5/8 And 3/8), Air Piping 48,000/60,000 Btus (Copper (7/8 And 3/8), Air Conditioning Equipment Rental, 24,000/30,000 Btus., Lease Of Evaporative Air Conditioner 35,000 M3/H., Lease Of Evaporative Air Conditioner 26,000 M3/H., Lease Of Evaporative Air Conditioner 7,000 M3/H., Rent Of Evaporative Air Conditioner 4,000 M3/H.
|