Construction Work – Development Of Large Investment Area Ig Hermsdorf Ost Iii, Lot 7 - Rainwater Systems Location B Civil Engineering And Civil Engineering. Lot 7 Rainwater Systems Location B Civil Engineering And Civil Engineering General Services (Construction Site Equipment, Traffic Safety, Construction Site Clearance) Set Up, Maintain, Operate And Clear Construction Site For Overall Construction Project 1 Psch Set Up, Maintain, Operate And Clear A Self-Sufficient, Mobile Power Supply System 270 M Construction Site Fence 1 M High 600 M Construction Site Fence 2 M High 17,000 M² Clear Construction Site 7,500 M² Construction-Time Areas Gravel Construction 1,700 M² Construction-Time Access Roads Asphalt Construction 5,100 M³ Topsoil Work 2 Hours Of Long-Term Traffic Safety Construction, Maintenance, Dismantling For L-Road 20,000 M² Mowing Property Areas 5,000 M² Removal Of Growth In Agricultural Areas 400 M Laying Drainage Pipes Dn 150 Sub-Object 4.3 - Rainwater Systems | Engineering Structures 1,200 M³ Topsoil Work 16,500 M³ Earthworks For Construction Pits And Pipe Trenches 11,500 M³ Soil Replacement 1 Piece. Manufacture Of Rainwater Treatment Basins (Rkb) Volume Approx. 320 M³ In In-Situ Concrete Construction Including Drainage Work And Equipment 1 Piece. Manufacture Of Rain Retention Basins (Rrb) Volume Approx Incl. Dewatering And Equipment 380 Pieces Of Micro Piles For Buoyancy Protection L = 6.00 M 1 Piece Idm Structure In In-Situ Concrete Construction, L X W X D = 4.75 X 3.30 X 4.55 M Incl. Equipment 1 Piece Of Rubble Trap In Prefabricated Construction L X W X D = 2.70 X 2.70 X 4.50 M Incl. Equipment 15 M Reinforced Concrete Pipes Dn 600 To Dn 800 1,150 M³ Unbound Base And Surface Layers 1,700 M² Asphalt Base And Surface Layer Bk. 0.3 - Bk 1.8 According To Rsto For Rrb And Rkb Bypasses 125 M On-Board System 430 M³ Drainage Troughs 270 M Fencing 2 M High With Gate Systems 5 M Width 180 M Cable Trench For Lighting System 5 Light Pole Foundations For Lighting System 120 M Empty Pipe System Pe-Hd Da 110 80 M Empty Pipe System Pe-Hd Da 50 Sub-Object 4.6 - Rainwater Systems | Sewer 100 M³ Topsoil Work 1,900 M³ Earthworks Pipe Trenches Including Dewatering 1,600 M³ Soil Replacement 1,800 M² Shoring Work 200 M Reinforced Concrete Pipes Dn 600 To Dn 1,000 20 M Pp Sewers Dn 200 To Dn 400 4 Reinforced Concrete Shafts Dn 1,500, T Up To 5.00 M 2 Pcs Shaft Structures T Up To 5.00 M 50 M² Surface Restoration Asphalt Base And Surface Layers Bk. 10 According To Rsto 200 M Sewer Inspection Up To Dn 1,000 Sub-Object 3.3 - Dirty Water Systems 20 M³ Topsoil Work 370 M³ Earthworks Pipe Trenches Incl. Dewatering 310 M³ Soil Replacement 910 M² Shoring Work 130 M Sewage Pressure Pipe Od 90, 125 Sdr 11 Pe 1 Piece Reinforced Concrete Shaft Dn 2000 Sewage Pressure Pipe Sub-Object 5.4 - Water Supply Systems 90 M³ Topsoil Work 1,100 M³ Earthworks Pipe Trenches Incl. Dewatering 1,100 M³ Soil Replacement 2,300 M² Shoring Work 350 M Pe 100 Rc Od 250 Drinking Water Pipe 33 Pieces Ggg - Fittings Dn 200, Butterfly Valves, Fittings, Underground Hydrants, Ventilation Fittings 100 M² Surface Demolition And Restoration In Asphalt Construction 350 M Rinsing, Sterilization And Pressure Testing Drinking Water Pipe Up To Dn 250 Sub-Object 7.3 - L
|