Industrial Inspection Services – Electrical Measurement Services In The Underground Part Of The Wieliczka Salt Mine. 1. Subject Of The Order. The Subject Of The Order Is The Provision By The Contractor To The Ordering Party Of Services Consisting In Performing Electricity Measurements In The Underground Part Of The Wieliczka Salt Mine. 2. Electricity Measurements 2.1 Electricity Measurements Referred To In Point 3, Should Be Performed In Accordance With: 1) The Schedule Established By The Ordering Party, On The Dates Indicated Therein. The Schedule Is Established Annually For A Given Calendar Year, Taking Into Account The Applicable Legal Provisions And The Provisions Of The Technical And Operational Documentation Of The Devices. The Schedules For Performing Electricity Measurements For 2026, 2027 And 2028 Constitute Annex No. 1, 2 And 3, Respectively, To The Contract Template, 2) Upon The Ordering Partys Orders Within The Scope Not Covered By The Schedule Referred To In Point 1 Above, The Performance Of The Service Covered By The Order Should Be Commenced Within 24 Hours From The Date Of Submitting The Order For These Services By E-Mail. 2.2 A Detailed List Of Services, The Place Of Provision And Their Maximum Quantities Are Included In Table A And Table B Below. Table A No. Name Of The Service Place Of Service Provision Maximum Number Of Measurements 1. Measurement Of The Insulation Resistance Of Motor Windings With A Voltage Of Up To 1 Kv, Underground Part Of The Mine 300 2. Measurement Of The Resistance Of Motor Windings With A Voltage Above 1 Kv, Underground Part Of The Mine 10 3. Measurement Of Resistance Insulation Of Motor Windings With A Voltage Of Over 1 Kv Underground Part Of The Mine 40 4. Measurement Of The Insulation Resistance Of Transformer Windings With A Power Of Up To 1.6 Mva Underground Part Of The Mine 50 5. Measurement Of Leakage Protection Rrgx, Rrgzx, Cuki-05, Pcb/M/3/220, Uki-24, Etc. Underground Part Of The Mine 100 6. Measurement Of Low-Voltage Switch Type Bergamo, Isol, Nh, Sh, S6n630, Fk 800, Msl-200, Wsca, Ts800n, Apu, Etc. Underground Part Of The Mine 50 7. Measurements Of Station And Traction Battery Batteries Underground Part Of The Mine 80 8. Periodic Measurements Of Portable And Mobile Electrical Equipment Used In Mining Underground Part Of The Mine 800 9. Measurements Of Station Batteries - Half-Yearly, Underground Part Of The Mine 56 10. Periodic Measurement Of A Power Switch With A Rated Voltage Up To 20 Kv (Contact Resistance, Non-Simultaneous Opening Time, Insulation Resistance Of Main And Auxiliary Circuits) Underground Part Of The Mine 40 11. Measurement Of Insulation Of A Power Switch With A Rated Voltage Up To 20 Kv Underground Part Mine 40 12. Measurement Of The 1-Phase Primary Release Wip, Underground Part Of The Mine 6 13. Measurement Of The 1-Phase Primary Release Wipx, Underground Part Of The Mine 6 14. Measurement Of 3-Phase Thermal Protection. Low Voltage Engines Underground Part Of The Mine 10 15. Measurement Of The Insulation Resistance Of The Main Busbars Of One Section Of The Mv Switchboard Underground Part Of The Mine 11 16. Measurement Of A Current Transformer Up To 20 Kv Underground Part Of The Mine 60 17. Measurement Of A Voltage Transformer Up To 20 Kv Underground Part Of The Mine 30 18. Measurement Of The Ferranti Transformer Underground Part Of The Mine 30 19. Measurement Of The Transformer Lv Electricity Underground C
Contact Information
Address
Park Kingi 1
Contact No.
+48 12 278 71 11
Email
sekretariat.sa@kopalnia.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111801508
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.