|
Architectural And Related Services – Renovation, Reactivation And Conversion Of The Historic Prelature Building, Optionally With Outbuildings; Property Planning Of The Outdoor Facilities In Accordance With § 39 Ff Hoai 2021, Lph 1-9, With Step-By-Step And Construction Phase-By-Construction Orders. Subject D. The Order Is The Object Planning D. Outdoor Facilities (Fa) In Accordance With §§ 39 Ff Hoai 2021, Lph 1-9, When Commissioned In Stages And In Construction Phases, Within The Framework Of D. Construction Project Renovation, Reactivation, Conversion D. Historian Prelature Building (Pg), Opt. With 3 Outbuildings (Ng) In 86736 Auhausen. The Community Of Auhausen (Donau-Reis District, Approx. 1000 Inhabitants) Would Like To Take Part In The Lauf. Town Center Redevelopment In Urban Development Funding. Social Cohesion Its History. Upgrade The Town Center And Further Develop It In A Targeted Manner. The Goals Described In The Isek Were Developed In An Mbs. The Pg Opt. With Ng (Klosterhof Estate 1) The Public Used (Usage Concept Var. Iii Mbs). The Fa Planning Includes, In Addition To A) Development Of The Former. Pg Optionally Also B) D. Ng, C) The Perimeter, D) The Green Town Center (Om), E) The Southern Area Of The Former Monastery Church (K), F) The Perimeter Of The Sports And Multi-Purpose Hall (Mzh), G) The Info Point And The Rear Area D. Ng, H) The Monastery Courtyard (Kh) And I) The Representation Of The Archaeological Traces Outside. The Obj.Pl. The Building Will Be Realized In 2 Construction Phases (Ba1 And Optional Ba2). Several Bas Are Planned For The Fa Planning, Initially The Lph 1-2 Are Commissioned For The Entire Planning Scope, The Further Stages, Ba And, If Necessary, Special Ones. Services Are Ordered Optionally. ---- On The Church Between The North, Pg/Ng To The West, Mzh/Kiga To The South And A Private Area To The East. 11/8 Is The 1400M² Meadow Intended As Om, Through Which The Surrounding Public Areas Can Be Accessed. Properties Should Be Related To Each Other. There Should Be A Connection, Accessibility, Cultural, Sporting And Community-Promoting Public Uses, Attractive Town Centers Are Created With A High Quality Of Stay That Reflects The Historic. The Town Center Is Upgraded, Is Largely Barrier-Free Accessible And Is As Easy As Possible For Pedestrians, Cyclists And Car Traffic And Can Be Reached Directly From All Districts And From Outside (Including Entrances, Routing, Driveways, Possible Parking Spaces, E-Bike Charging Stations If Necessary). Part D. Measures Also Include The Planning Of A Calisthenics Facility For The Mzh, The Church Garden And A Barrier-Free Connection To The Cemetery. --- The Pg (Hipped Roof Building) Is An Individual Monument From The 13Th Century In The Archaeological Monument Area. A Survey Of The Fa Area Was Carried Out. The Monument Preservation Department Recommends That It Is Available. Archaeological Monuments Should Be Left In The Ground In Order To Preserve Them. To Secure Cultural Assets. A Representation (I) Is Possible Via Surface Design. The Construction Project Will Be Archaeological. Cared For. In The Environment D. Pg Are 3 Ng Oh. Monument Status For Which New Buildings Are Likely To Be Replaced. --- In This Process, The Second Stage Of The Process Is To Propose Solutions In The Form Of A Planner. Concept For The Legal Scope Must Be Submitted (Multiple Assignment). The Proposed Solutions Are With Regard To Urban Planning. Goals And Taking Into Account D. Mbs (Building Planning Var. Iii With Usage Concepts) And Adjustments That Have Now Been Made
|