Engineering Services – Extension Of Liebfrauengymnasium, Specialist Planning Hlse. At The Same Time, Existing Space Deficits That Arose From The Installation Of A Cafeteria, The Expansion Of All-Day Care And Fire Protection-Related Usage Adjustments Must Be Compensated For. The Switch To G9 Is Expected To Increase The Number Of Students By Around 110 Students. This Results In An Additional Need For Classrooms, Additional Rooms And Sanitary Areas. To Meet This Need, The Existing School Building Will Be Expanded By Another Floor. In Addition, Measures For Energy-Efficient Renovation Of The Building Shell, Adjustments To The Existing Floors, The Expansion Of The Stairwells And Barrier-Free Access Through The Installation Of An Elevator Are Planned. The Increase Includes Approx. 1,427 M² Of Net Space. Twelve Classrooms Are Planned, Two Of Which Can Be Connected To Larger Units Using Mobile Partitions, A Teachers Room, A Copy And Storage Room, Two Student Toilet Facilities, Two Teacher Toilet Facilities, A Wheelchair-Accessible Toilet And A Cleaning Supplies Room. On The Existing Floors, The Spatial Structures In The Affected Areas Will Be Adjusted Accordingly. The Extension Is Carried Out Using Lightweight Construction With An Etics Facade. Plastic Windows With Triple Glazing And External Blinds In The Classrooms Are Planned. The Roof Is Designed As A Flat-Sloping Wooden Gable Roof; The Top Floor Ceiling Receives Additional Insulation. The Installation Of A Photovoltaic System Is Being Prepared. The Interior Design Includes Light Partition Walls, Wooden Doors In Steel Frames, Wall And Ceiling Surfaces With Fleece And Paint, As Well As Floating Screed With Linoleum Covering Or Comparable Covering. The Stairs Between The 2Nd And 3Rd Floors Are Made Of Reinforced Concrete With Artificial Stone Covering, Similar To The Existing One. In The Existing Building, The Energetic Renovation Of The Facade, The Replacement Of The Windows, The Installation Of Sun Protection Systems, The Renewal Of The Flat Roof Structure Of The Bridge As Well As The Restructuring Of Rooms And The Renewal Of Wall, Floor And Ceiling Surfaces Are Planned. A Static Preliminary Investigation Confirms The Basic Feasibility Of Adding A Lightweight Building. The Heat Is Supplied Via The Existing Heating System. The Ventilation Is Intended As Natural Window Ventilation. The Sanitary Facilities Are Connected To The Existing Pipework. Planning And Implementation The Subject Of This Tender Is The Awarding Of Service Phases 1 To 8 Of The Tga Planning In Accordance With Hoai. The Building Application Is Currently Being Examined By The Building Inspectorate. Further Planning Must Be Based On The Existing Specifications, Design Decisions And Approved Documents. At The Same Time, The Requirements For Accessibility, Flexible Educational Usage Concepts, Energy Efficiency And Sustainable Construction Must Be Taken Into Account. All Relevant Legal And Technical Requirements, Especially Regarding Fire Protection, En
Contact Information
Contact No.
+49 5251308-3016
Email
submissionsstelle@kreis-paderborn.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111800715
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.