Construction Work For Military Buildings And Installations – Nasszellen. New Accommodation Building Buildings 117 And 118 In The Werratal-Kaserne Bad Salzungen Property, Hersfelder Straße In 36433 Bad Salzungen Information About The Accommodation Buildings: Two Four-Story Accommodation Buildings With No Basement Are To Be Built With A Roof Control Center (Rlt) In The Gable Roof Space. The Accommodation Rooms (Single Rooms With Wet Rooms), Accessed Via A Continuous Central Hallway, Are Oriented South Towards The Access Road And North Towards The Green Area. The Buildings Have 4 Full Floors Above Ground And End With A Gable Roof. The Floor Height On All Floors Is Approx. 3.00 M. The Accommodation Buildings 117 And 118 Will Be Built In A Staggered Manner. Information About The Trade: The Prefabricated Wet Cells Are Placed On The Finished Concrete Ceiling Or Floor Slab. The Wet Cells Are Installed Point By Point Using Sound Decoupling Supports. Installation Takes Place Before The Concrete Floor Above Is Poured. The Delivery Must Therefore Be Adapted To The Construction Progress Of The Shell. 276 Wet Rooms Are Required For Accommodation Buildings 117 And 118. They Are Prefabricated And Delivered As A Complete Room Unit With Interior Fittings And Installations. Two Prefabricated Wet Cells Are Placed Back To Back And Supplied Via A Common Supply Shaft. This Results In A Type L (Left) And R (Right) With A Mirrored Version. Factory Execution And Subsequent Delivery Of 276 Wet Cells As A Prefabricated Construction, Each Consisting Of: - 1 Concrete Floor Slab With Integrated Underfloor Heating, - 2 Reinforced Concrete Side Walls, - 2 Drywall Side Walls, - 1 Drywall Ceiling, - 1 Door Frame, - 1 Construction Door, - Including Tiles, Sanitary Equipment (Washing Area, Toilet, Shower) And Technical Equipment (Heating, Plumbing, Ventilation And Electrical) External Dimensions Of The Bathroom Cell Approx. 1.65 X 2.80 M Clear Room Height Approx. 2,500 Mm Total Wall Height Approx. 2,700 Mm The Interface For The Technical Installation And Equipment (Heating, Sanitary, Ventilation, Electrical) Between The Wet Cell Contractor And The Contractors Of The Technical Trades Heating, Plumbing, Ventilation And Electrical Is The Wall Shell Of The Wet Cell. The Vertical Pipe Runs For Cold Water And The Connection To The Rear Wall Of The Wet Cell In The Area Of The Shaft Structure Are Manufactured On Site. The Technical Installation Of The Vertical Strands Of Hot Water And Heating Pipes In The Wall Shell Of The Wet Cell Are Pre-Assembled By The Wet Cell Contractor. They End Above And Below The Wet Room. The Vertically Pre-Installed Lines Must Be Bridged Between The Wet Cells In The Area Of The Floor Ceiling Openings Using Appropriate Connecting Pieces By The Wet Cell Contractor On Site At The Construction Site. The Tolerances Of The Vertically Pre-Installed Cable Runs Between The Floor Levels Must Be Compensated For Using These Connecting Pieces. The Following Applies To The Work Described Above
Contact Information
Contact No.
000
Email
hochbau.vergabe@tlbv.thueringen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111799688
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.