|
4.1. The Subject Of The Order Is The Implementation Of The Investment Entitled: Reconstruction Of The Water Intake Station In Czysta Dębina.4.2. The Subject Of The Order Includes The Implementation Of, Among Others: Construction And Installation Works In Accordance With The Act Of July 7, 1994 - Construction Law (Journal Of Laws Of 2025, Item 418, As Amended). The Proceedings Were Divided Into Two Separate Parts, Each Of Which Covers An Independent And Specific Material And Technological Scope. Contractors May Submit Offers For Each Part Separately.4.3. Scope Of The Subject Of The Order: 1) Part I - Reconstruction Of The Water Intake Station In Czysta Dębinaa) Data Regarding The Reservoir Of The Water Intake Station: Construction Works Should Be Carried Out In Accordance With The Construction Design, Stwior, Bills Of Quantities - As An Auxiliary Element For Preparing The Valuation, Swz And The Submitted Offer. B) Basic Technical Parameters Of The Water Intake Station: The Water Supply Station Facilities Are Used To Collect, Collect And Distribute Water To Recipients For Domestic And Fire Protection Purposes. As Part Of The Investment Task, It Is Planned To Carry Out Construction Works At The Water Supply Station In Czysta Dębina, Changing The Existing Development Of The Sw Area. The Current Development Of The Plots Is Presented On The Development Plan Of The Water Supply Station Area In Czysta Dębinie - Attached To The Graphic Part Of The Project And Includes: - Fenced Area In The Shape Of A Polygon, Fenced Area Is 982 M² - Elements Of Plot Development: - Well Shaft With Deep Well No. S-2 - Exploited, With An Internal Diameter 1.5 M And A Building Area Of 1.77 M 2 , - Water Supply Station Building With Equipment, Dimensions: 6.50 M X 3.75 M, With A Building Area Of 24.38 M² (Rooms: Technological Hall, Auxiliary Room), Building Volume 73.14 M 3 , - Steel Water Tank With A Capacity. 25 M 3, Dimensions 2.85 M X 5.45 M, Area 15.53 M², - Sanitary Sewage Wells With An Area Of 3.99 M 2, - Green Area, - Steel Mesh Fence, 132.15 M Long, - Underground Utilities: Pipelines Of The External Technological System, Supply Of The Existing Water Supply Network, Control Cables, Power Cables. C) Scope Of Work Performed: Construction Works To Be Performed At The Czysta Dębina Water Intake: - Installation Of A Steel Tank Fire Protection Water Retention System, With An Internal Diameter Of 3.88 M, A Height Of 5.4 M And A Capacity Of V = 50 M3, Building Area Of 17.35 M2, - Construction Of A Water Intake Station Building With Dimensions 4.50 M X 7.50 M And A Built-Up Area Of 33.75 M2. The Building Was Designed In Traditional Technology. Light Inter-Story Ceiling On Wooden Beams. Gable Roof With Wooden Structure, Rafters, Covered With Steel Sheet. Pvc Window And Door Joinery. The Heat Transfer Coefficient For Windows Is Max. 0.9 W/(M2)K, The Penetration Coefficient For The Door Is 1.3 W/(M2)K, - Installation Of A Second Stage Pump Set With A Capacity Of 14 L/S A
|