1. The Subject Is The Implementation Of The Task Entitled: Modernization Of The Village Community Center In Kamianka, Which Includes: - Dismantling The Existing Wooden Floor And Joists 100.86 M2 - Installation Of Moisture And Waterproof Insulation From A Wide Polyethylene Foil - 100.86 M2 - Installation Of Insulation From Eps 100-038 Polystyrene Boards, 5-8 Cm Thick 100.86 M2 - Installation Of The Layer Leveling Layer For Cement Mortar Floors, Approx. 7 Cm Thick, Including Reinforcement, 100.86 M2 - Construction Of Terracotta Tiles/Artificial Stone Floors, Dimensions 60X60 Cm, Laid With Glue, 100.86 M2 - Construction Of A Plinth Made Of Artificial Stones, 10 Cm High, And 40 M - Insulation Of The Ceiling With Mineral Wool, Min. 20 Cm Thick, With An Insulation Factor Of Min. Λd = 0.039 W/Mk (Flat Roof; Ready-Made) Wool Mounting Frame Used From The Armstrong Ceiling 146.00 M2 - Construction Of An Amstrong Suspended Ceiling With Preparation Of The Structure 146.00 M2 - Installation Of Led Lighting In The Suspended Ceiling. Lamps 60/60 Along With Replacement Of The Existing Electrical Installation And Construction Of 5 Separate Power Supply Circuits 25 Sets - Installation Of Roof Vents Typical For Roof Tile Coverings Mounted On Pvc Pipes With A Minimum Diameter Of 160 Cm Insulated With Mineral Wool 3 Sets - Scraping And Washing Off Old Paint From The Walls, Including Oil Paint 145.00 M2 - Application Of A Cement Finish Along With Embedding Fiberglass Mesh, Smoothing By Sponging, Priming Walls And Installing Corners And Processing Glyphs On Windows And Doors (35 Meters) 145.00 M2 - Two-Time Painting Of Walls With Latex Paints 145.00 M2 - Two-Time Painting Of Walls And Ceilings With Latex Paints Along With Priming Walls And Repairing Plaster Defects In Walls (15% ) 45.00 M2 - Chipping Terracotta On The Walls With Filling The Plaster And Gaps 20.00 M2 - Facing Walls And Floors With Glazed Tiles And Preparing The Substrate 44.00 M2 - Repair Of Inlet Pipes With Replacement Of Valves - 5 Sets - Replacement Of Washbasin And Sink Faucets - 3 Sets - Installation Of Single Washbasins With Siphon - 2 Pcs. - Installation Of Single Toilets With Flushers - 2 Pcs. - Replacement Of Internal Plate Doors (Leaves) On Existing Steel Frames, Along With Painting The Frames With Oil Paint Twice - 6.80 M2 - Removal Of Old External Window Sills And Installation Of New Ones Made Of Coated Sheet Metal With A Roll-Out Of 30 Cm 2.00 M2 - Insulation Of Walls With Thick Polystyrene Boards 10 Cm And A Conductivity Coefficient Of At Least 0.031 W/(M*K) Including Gluing The Mesh, Placing Angle Brackets, Applying Glue Twice And Applying Silicone Plaster - 170.00 M2- Insulating The Reveals With 2 Cm Thick Polystyrene Boards And Conducting Coefficient Of Min. 0.031 W/(M*K) Including Gluing The Mesh And Applying Glue And Applying Plaster Silicone 6.5 M2 - Insulation Of The Plinth With Aqua Polystyrene Foundation Boards With A Thickness Of 8 Cm And A Conductivity Coefficient Of At Least 0.
Contact Information
Address
Gmina Repki,Repki,08-307,Mazowieckie,Pl925 - Siedlecki
Email
a.skorupka@repki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111742752
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.