|
Tender Available Date: Saturday, April 11, 2026.Tender Closing Date: Thursday, June 11, 2026.Pre-Tender Meeting: Session No. 1: April 27, 2026 At 1:30 To 3:30 Pm, Mst , Main Conference Room At 1St Floor 4709 44 Ave, Stony Plain, Ab, T7z 1N4. Attendees May Also Join The Meeting Via Microsoft Teams Using The Link Below: Https://Teams.Microsoft.Com/Meet/285728849795821?P=Hptfqfcvn7soratmfh Session No. 2: To Be Determined (Tbd)Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation And Economic Corridors. E-Mail: Ikhtiyar.Mammadov@Gov.Ab.Ca.Tenders Will Only Be Received By Email At Trans.Tender@Gov.Ab.Ca, Before 2:01:00 P.M., For Construction Of The Following Work:Tnd0020479clearing, Grading, Granular Base Course, Asphalt Concrete Pavement And Other Work40:30 To :32, S. Of Pinto Creek To N. Of Berland River, Abkilometre 53.910 To 57.220Kilometre 9.400 To 25.200Grading, Granular Base Course, Asphalt Concrete Pavement, Street Light Installation And Other Work40:32, Safety Rest Area - Adjacent To The N.B.L. Of Hwy. 40, S. Of The Berland River, Abconstruction Of S.P.C.S.P. Culvert, Grouting And Abandoning Of Existing Culvert And Other Work40:30, B.F. 77193 - Carrying Hwy 40 Over A Watercourse, N. Of Entrance, Abconstruction Of S.P.C.S.P. Culvert, Removal And Disposal Of Existing Culvert And Other Work40:30, B.F. 77194 - Carrying Hwy 40 Over Pinto Creek, N. Of Entrance, Abconstruction Of Precast Prestressed Concrete Girder Bridge, River Training, Demolition Of Existing Bridge Structure And Other Work40:32, B.F. 77196 - Carrying Hwy. 40 Over The Tributary To Fox Creek, S. Of The Berland River, Abconstruction Of Structural Steel Girder Bridge, Bank Protection, Demolition Of Existing Bridge Structure And Other Work40:32, B.F. 74710 - Carrying Hwy. 40 Over The Berland River, Abnorth Central Regionapproximate Quantities:1 Lump Sum Environmental Management276,016.25 Tonne Supply Of Aggregate - With Option5.7 Hectare Clearing, Timber Salvage And Mulching41,130 Cubic Metrerippable Rock Excavation - Premium685,490 Cubic Metre Common Excavation46,060 Cubic Metre Borrow Topsoil Excavation72,000 Cubic Metre Borrow Excavation59,500 Cubic Metre Common And/Or Borrow Excavation Loaded To Trucks252,170 Cubic Metre Kilometre Overhaul218 Metre Culverts - Supply And Install (600 Mm Dia. C.S.P.)286 Metre Culverts - Supply And Install (800 Mm Dia. C.S.P.)84 Metre Smooth Wall Steel Pipe - Supply And Install (900 Mm Dia.)76 Metre Smooth Wall Steel Pipe - Supply And Install (1 200 Mm Dia.)3,730 Cubic Metre Filter Material Des. 8 Class 251,930 Metre Turbidity Curtain - 1.5 M High1,830 Cubic Metre Heavy Rock Riprap (Class 1)2,650 Cubic Metre Heavy Rock Riprap (Class 1M)12,770 Square Metre Turf Reinforcement Mat (Type C)33,770 Square Metre Erosion Control Soil Covering - Supply And Install (Type C)3,220 Metre Synthetic Permeable Ditch Barrier769,340 Square Metre Topsoil Placement46.93 Hectare Drill Seeding19.60 Hectare Hydro-Seeding240,400 Square Metre Slope Texturing8.7 Hectare Tree Planting - 2 M X 2 M Grid234,960 Square Metre Preparing Subgrade Surface (First Layer)196,800 Tonne Granular Base Course Des. 2 Class 2533,910 Metre Cutting Of Pavement1,890 Metre Crack Repair - Shallow Mill And Fill34,380 Square Metre Cold Milling Asphalt Pavement - 50 Mm Depth57,570 Tonne Asphalt Concrete Pavement - Eps Mix Type H2 (Pg 58-28)9,890 Tonne Asphalt Concrete Pavement - Eps Mix Type S3 (Pg 58-28)19,11 Kilometre Roadway Lines - Supplying Paint And Painting (Directional Dividing And 2 Edge Lines)31.80 Kilometre Milled Rumble Strip - Shoulderb.F. 77193 - Carrying Hwy 40 Over A Watercourse Near Entrance1 Lump Sum Traffic Accommodation For Bridge Construction (B.F. 77193)1 Lump Sum Grouting Of Abandoned Culverts (B.F. 77193)1 Lump Sum Spcsp - Supply (B.F. 77193)1 Lump Sum Spcsp - Assembly (B.F. 77193)B.F. 77194 - Carrying Hwy 40 Over Pinto Creek Near Entrance 1 Lump Sum Traffic Accommodation For Bridge Construction (B.F. 77194)1 Lump Sum Demolition And Disposal Of Bridge Structure (B.F. 77194)1 Lump Sum Spcsp - Supply (B.F. 77194)1 Lump Sum Spcsp - Assembly (B.F. 77194)B.F. 77196 - Carrying Hwy 40 Over The Tributary To Fox Creek, 67 Km Nw Of Hinton 1 Lump Sum Traffic Accommodation For Bridge Construction (B.F. 77196)1 Lump Sum Demolition And Disposal Of Bridge Structure (B.F. 77196)1 Lump Sum Headslope Preparation And Backfill - (B.F. 77196)306 Metre Supply Of Piling - Plain Steel H-Pile - 310 X 79 Mm (B.F. 77196)18 Pile Pile Set-Up (Driven Piles) - H-Pile (B.F. 77196)185 Metre Supply Of Piling - Plain Steel Pipe Pile - 610Mm Dia. X 9.5Mm (B.F. 77196)265 Metre Pile Driving - Pipe Pile (B.F. 77196)1 Lump Sum Precast Concrete Units - Supply And Fabrication, Delivery And Erection - 8 M Slc-510 (B.F. 77196)1 Lump Sum Precast Concrete Units - Supply And Fabrication, Delivery And Erection - 10 M Slc-510 (B.F. 77196)78 Cubic Metre Pile Concrete (Class) - Supply And Place (B.F. 77196)50 Cubic Metre Concrete (Class C) - Supply And Place (B.F. 77196)B.F. 74710 - Carrying Hwy 40 Over The Berland River, 62 Km N. Of Entrance1 Lump Sum Demolition And Disposal Of Bridge Structure (B.F. 74710)1 Lump Sum Excavation - Structural (B.F. 74710)16 Pile Drill Rig Set-Up (Drilled Piles) - 600 Mm Dia. Concrete Pile (B.F. 74710)192 Metre Pile Installation (Drilled Piles) - 600 Mm Dia. Concrete Pile (B.F. 74710)307 Cubic Metre Concrete (Class Hpc) - Supply And Place (B.F. 74710)37,692 Kilogram Corrosion Resistant Reinforcing Steel - Supply (B.F. 74710)1 Lump Sum Structural Steel - Supply And Fabrication, Delivery And Erection (B.F. 74710)1 Lump Sum Bridgerail - Supply And Fabrication, Delivery And Installation (B.F. 74710)2,800 Cubic Metre Heavy Rock Riprap (Modified Class 3) - (B.F. 74710)Contractor To Supply All Materials.Contract Completion Date: May 30, 2028.
|