The City Of Espoos Tilapalvelut Liikelais (Later The Client) Requests Bids For The Repair Work Of The Water Roof And Frame Of The Laaksolahti Football Hall As A Fixed-Price Total Contract. Familiarization Visit: The Client Requires The Bidder To Participate In A Mandatory Familiarization Visit Organized By The Client Before Bidding. A Mandatory Familiarization Visit Will Be Organized On April 21, 2026 From 1:00 P.M. To 2:30 P.M. The Name And Address Of The Object Is Laaksolahti Football Hall, Lähdepurontie 1,02720 Espoo. The Customer Rejects The Offer If The Offeror Has Not Familiarized Himself With The Destination During The Familiarization Visit Organized By The Customer. You Must Register For The Familiarization Visit In Advance By 12:00 On April 21, 2026. Registration Is Done By E-Mail Vesa.Pyy@Espoo.Fi. If Registrations Are Not Received By The Deadline, The Client Reserves The Right To Postpone The Familiarization Visit, Which Will Be Announced Separately On The Tarjouspalvelu.Fi Supplier Portal. Project The Contract Area Of The Project Is The Hall Building And The Maintenance Building Immediately Connected To It. The Most Essential Works In The Project Are The Repair Of The Water Roof Of The Soccer Hall And The Strengthening And Repair Of The Load-Bearing Steel Frame. The Repair Of The Waterproofing Of The Water Roof Is Aimed At Both The Hall And Maintenance Building. Water Roofs And The Frame Will Be Repaired To The Extent Shown In The Plans. The Construction Project Also Includes Small Enhancement Measures, Such As The Renewal Of Plinth Sheeting And Plinth Seam Masses, Which Will Be Carried Out To The Extent Shown In The Plans. The Repair Work On The Water Roof Of The Football Hall Will Be Carried Out Without A Protective Tent Covering The Entire Construction Area. The Plans For Temporary, Local Weather Protection Solutions Are Approved By The Customer And The Structural Engineer Before The Weather Protection Installation Works. When Installing The Water Cover Of The Football Hall, It Should Be Noted That Part Of The Water Roof Has To Be Repaired Up To The Load-Bearing Profile Sheet So That Moisture Does Not Enter The Structures During The Construction Work. Work Shifts And Tasks Must Be Planned So That At The End Of The Work Shifts, The Water Cover Of The Football Hall Section Always Protects The Structure From Water And Weather. The Contract Also Includes The Installation Of All Vacuum Fans According To The Plans And The Bitumen Sealing Of The Collars Of The Smoke Extraction Hatches All Around, So That No Moisture Gets Into The Water Roof Structures At Any Stage Of Construction. Regarding The Maintenance Building At The End, The Water Roof Structures Will Be Renewed From The Load-Bearing Profile Sheet And The Water Roof Repair Work Will Be Carried Out Completely Under Weather Protection. The Structures Surrounding The Areas To Be Repaired Will Be Insulated And Protected While The Repair Work Is Carried Out. The Contractor Will Draw Up A Dust Management Plan, Which Must Include Clear Solutions To Ensure That Firework Can Be Carried Out Safely In The Hall. The Sports Field Will Be Protected With Construction Boards From The Areas Where Heavy Machinery Is Driven, Where There Is Constant Foot Traffic Or Where Building Materials Are Stored. As Protection, Obs 18 Mm Or Similar Load-Bearing Construction Board. In Addition, Load-Distributing Balustrades Must Always Be Placed Under The Support Points Of Heavy Equipment To Prevent Depressions In The Artificial Turf Field. The Contractor Presents The Protection Plans To The Client Before The Start Of The Construction Work. The Surrounding Structures Must Be Protected Especially Well During The Demolition Work, And The Movement Of Loose Material Into The Environment During The Work Must Be Prevented As Efficiently As Possible. During Painting, Coating And Sealing Work, The Surrounding Structures Are Protected From Splashes. The Work Follows The Work Safety Instructions And Plans Of The Customer, The Structural Designer And The Contractor. Supervisors Of Construction And Building Technical Works And An Occupational Safety Coordinator Will Be Appointed For The Duration Of The Contract Work. The Sports Hall Must Be Out Of Use During The Reinforcement Operations Of The Steel Frame. In Principle, The Maintenance Building Can Be Used During The Confirmation Measures And Water Roof Repair Work. The Customer Will Choose One Supplier And One Backup Supplier Based On The Tender. The Initial Contract Period Is 1 June 2026 – 30 November 2026 (6 Months). The Contractor Submits A Preliminary Schedule As An Attachment To The Offer. The Form Of The Contract Is A Complete Contract. All Work Presented In The Tender Documents Is Included In The Total Contract. The Selected Supplier Acts As The Main Contractor In The Project And As The Main Implementer In Accordance With The Government Decree On The Safety Of Construction Work (2009/205). The Customer Does Not Commit To The Announced Procurement Quantities.
Contact Information
Address
Pl 6200
Contact No.
+358981621
Email
tilapalvelut.hankinnat@espoo.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111685649
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.