Foundation Work Before Asphalting Of Municipal Roads 2026 – Ibestad Municipality . Descriptionbased On A Decision In Ibestad Chairmanship, Case 4/26, The Following Roads/Places Are To Be Upgraded: Straumbotnveien, Approx. 2530 Meters, Approx. 10,120 M2. Part 1: Removal Of Old Asphalt, Approx. 2,800 M2 And Mass Replacement Approx. 40 M3. Leveling The Top Layer Of Gravel 0-22 Before Paving. Ditch And Edge Cleaning On The Stretch As Required And In Agreement With The Municipality. Part 2: Leveling Of The Top Layer Of Gravel (Laid In 2025) Before Asphalting. Øver-Vik, Approx. 330 Meters, Approx. 990 M2 Preparation Before Asphalting, Road Approx. 4 M Width. Leveling With A Top Layer Of Gravel 0-22. Ditch And Edge Cleaning As Required And In Agreement With The Municipality. Existing Curbstones Are Removed And A New Guardrail With A Length Of 35 Meters Is Installed. The Thrift, Approx. 185 Meters, Approx. 830 M2. Preparation Before Asphalting, Road Approx. 4.5 M Width. Leveling With A Top Layer Of Gravel 0-22. Old Asphalt Must Be Removed, Approx. 600 M2. Ditch And Edge Cleaning As Needed And Agreed With The Municipality. Rabbenveien, Approx. 150 Meters, Approx. 450 M2. Preparation Before Paving, Road 3 M Wide. Leveling With A Top Layer Of Gravel 0-22. Old Asphalt Must Be Removed. Ditch And Edge Cleaning As Required And Agreed With The Municipality. Solstadveien, Approx. 230 Meters, Approx. 1200 M2 + 630 M2 Turning Space/Parking. Preparation Before Asphalting, Road Approx. 4 M Wide, Turning Space/Parking At The County Road Approx. 630 M2. Leveling With A Top Layer Of Gravel 0-22. Old Asphalt Must Be Removed. Ditch And Edge Cleaning As Needed And Agreed With The Municipality. Kipertnesveien, Approx. 170 Metres, 630 M2. Preparation And Gravel 0-22, Road Width Approx. 4 Metres. Ditch And Edge Cleaning As Needed And Agreed With The Municipality. Vardhågveien, Approx. 205 Metres, 735 M2. Preparation And Gravel 0-22, Road Width Approx. 4 Metres. Ditch And Edge Cleaning As Required And Agreed With The Municipality. Common: Added Top Layer Of Gravel Must Have Fraction 0-22. Ditch And Edge Cleaning Is Spread On Road Slopes On The Site According To Instructions. All Moving Of Equipment And Materials As Well As Rigging And Operation Must Be Included In The Offer. Mounted. Ditch Cleaning Must Be Priced Per 10 Meters Of Clean, And Not Included In The Sum. Edge Clean Must Be Priced Per 10 Meters Clean, And Not Lead To The Sum. Any Gutters Must Be Priced With Road Pipes Ø400 And Ø800, Length 6 Metres. Do Not Lead To Sum. In The Event Of Replacement Of Gutters, The Road Must Be Wedged Out With Approx. 10 Meters On Both Sides. However, The Length Can Be Reduced By Agreement With The Municipality, Depending On How The Local Masses In The Ground Turn Out To Be. If The Budget Is Exceeded, The Client Reserves The Right To Withdraw Section 7, Possibly Also Section 6 So That The Budget Is Met. In Addition, One Or More Of The Other Points Can Be Taken Out, In Whole Or In Part, After The Asphalt Contract Has Been Assessed.
|