|
4.1. The Subject Of The Order Is The Construction Of A Pedestrian And Bicycle Transport Route On The Ugoszcz - Studzienice Section On The District Road No. 1780G.4.2. The Subject Of The Order Includes, In Particular: 1) Construction Of A Pedestrian And Bicycle Route With A Minimum Width Of 2.5 M With A Bituminous Surface (Exceptionally With A Concrete Pavement Surface) On The Ugoszcz Section (From The Border With The Commune Of Bytów) To The Parking Lot By The Lake In Studzienice, 2) Reconstruction Of The District Road No. 1780G In Ugoszcz Consisting In The Construction Of An Island Of Refuge For Pedestrians And Cyclists Along With Widening The Surface, 3) Reconstruction Of The Intersection Of District Roads No. 1769G And 1780G,4) Construction / Reconstruction Of Existing Exits To The Areas Adjacent To District Road No. 1780G,5) Felling Of Trees And Bushes,6) Removal Of The Topsoil Layer,7) Demolition Of Road And Street Elements,8) Execution Of Earthworks (Excavations, Embankments) And Dredging (Removal Of Organic Soil),9) Construction Of Retaining Walls Using Prefabricated Elements, 10) Reinforcement Of The Existing Subfloor And Bringing The Subfloor To The Required Parameters, 11) Execution Of The Surface Structure Of The Pedestrian And Bicycle Route, Sidewalks, Exits And The District Road No. 1780G Along With The Framing Of Individual Types Of Surface, 12) Execution Of Finishing Elements, Including: Topsoiling, Reinforcement Of Slopes, Construction Of Sewage Systems, Etc.,13) Construction Of Elements Of The Target Traffic Organization, Including Horizontal Markings, Vertical Markings, Protective Barriers And Balustrades (As Elements Protecting Pedestrian And Bicycle Traffic),14) Construction/Reconstruction Of Drainage: Storm Sewage, Drainage Ditches, Culverts Under The Pedestrian And Bicycle Route And Exits Along With Cleaning Of Culverts Under The District Road No. 1780G,15) Reconstruction Of The Existing Lighting By Energa Ozdrowienie Sp. Z O. O.16) Reconstruction Of The Existing Low-Voltage Power Grids Of Energa-Operator S.A. Together With The Approval Of The Execution Designs By The Network Administrator,17) Construction Of Road Lighting At The Intersection Of District Roads No. 1769G And 1780G In Kostki,18) Construction Of Lighting For A Parking Space In The Forest Area,19) Construction/Reconstruction Of Park Lighting At The Lake In Studzienice,20) Reconstruction Of Telecommunications Equipment,21) Construction Of Small Architecture Elements, Including: Bicycle Racks,22) Tidying Up The Area After Completing All Construction Works,23) The Contractor Is Obliged To Submit All Documents Needed To Submit An Application For Completion Of Construction.24) The Task Should Be Implemented In Accordance With The Principles Of European Union Policies, Including Respect For Fundamental Rights, In Compliance With The Charter Of Fundamental Rights Of The European Union, As Well As The Principles Of Awarding Contracts, Environmental Protection, And Susta
|