The Subject Of The Order Is The Reconstruction And Modernization Of The Repair Hall (Part Iii) In The Building Of The Rolling Stock Service Station (Including Zero-Emission) Along With The Installation Of A Pv Installation, Energy Storage And The Necessary Technical Infrastructure At The Mpk Depot In Siedlce In The Design And Build Formula. The Scope Of Investment Includes:1. Design Works, I.E. Development Of Multi-Discipline Design Documentation (Plot Development Design, Architectural And Construction Design, Technical And Executive Designs, Stwiorb For All Industries), Reconstruction And Modernization Of The Technical Facilities For Servicing The Mpk Rolling Stock For The Scope Described In The Functional And Utility Program Along With All Arrangements And Decisions Necessary To Obtain A Building Permit (If Applicable), Industry Technical Acceptance And Occupancy Permit, Decisions, Arrangements, Etc., And Obtaining On Behalf Of The Ordering Party Obtains A Building Permit.2. Construction And Installation Works, I.E. Execution Of Construction And Installation Works For The Entire Scope Described In The Functional And Utility Program Based On The Design Documentation Prepared By The Contractor (Architectural, Construction And Technical) And The Building Permit Obtained On Behalf Of The Ordering Party, Including: General Construction Including, Among Others: Demolition And Dismantling, Backfilling Of The Canal, Demolition Of The Steel Structure, Hall Structure With Roof And Walls Covered With Boards Layered Construction (Including: Earthworks And Foundations, Steel Structure, Roof And Wall Cladding With Sandwich Panels), Floors (Reinforced Concrete Slab For The Lift Columns), Internal Works (Including Repair And Painting Of Wall Surfaces, Painting Of The Steel Structure And Visible Installation Pipes; Demolition Of The Wall Made Of Sandwich Panels), Painting Of Connections Between Halls, Construction Of New Toilets With Finishing And Equipment, Replacement And Strengthening Of The Roof Covering In The Remaining Part Of The Building For The Assembly Of The Structure And Photovoltaic Panels 240 Pcs., Replacement Of Windows And Doors, Reconstruction Of The Surface Around The Entrance Gates, Marking Inside The Hall, Adaptation To Fire Protection Regulations. Sanitary Including: Air Conditioning With Heating Function Approx. 25 Kw In The Workshop Part, Air Conditioning With Heating Function Approx. 20 Kw - Warehouse, Exhaust Gas Extraction System, Air Curtains, Renovation Of Bathrooms - Devices And Installation, Pneumatic Installation, Supply And Exhaust Ventilation Installation With Heat Recovery, Linear Drainage. Electrical Including: Delivery And Installation Of Photovoltaic Panels, Installation Of Inverters, Delivery And Installation Of Substructures For Photovoltaic Panels, Delivery And Installation Of Optimizers, Installation Of Dc And Ac Switchboards, Installation Of Ac Cabling, Telemechanics, 129Kwh Energy Storage, Parameterization, Commissioni
|