|
Supply And Placement Of Construction Sign Made Of Galvanized Sheet 26, Esp. 0.45Mm, Dimension (3X1.5)M Supply And Placement Of Work Sign In Galvanized Sheet 26.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On Metal Structure Of Metalon 20X20mm, Special. 1.25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, Mechanical Excavation Of Trenches With A Depth Of Less Than Or Equal To 1.5M, Including Loading On A Truck, Ex Mechanical Excavation Of Trenches With A Depth Of Less Than Or Equal To 1, Exclusive Transport And Unloading, Mechanized Piling At The Bottom Of A Trench With Vibrating Plate, Exclusive Excavation. Mechanized Piping In Trench Bottom With Vibrating Plate, Excavation Exclusive, Simple Boca De Lobo (Type B - Concrete), Frame, Grid And Angle, Including Excavation, Backfill Simple Boca De Lobo (Type B - Concrete), Backfill And Outlet, Simple Concrete Pipe, Class Ps1, Diameter 600Mm, Inclusive Supply, Laying And Grouting Simple Concrete Pipe, Laying And Grouting, 04/10/2026 - 10:38:29, 04/10/2026 - 10:38:30, Tubular Network Wing Dn 600, Exclusive Boot Outside Tubular Network Wing Dn 600, Exclusive Boot Outside, Gutter Concrete In Cut Type Dr.Scc-X/Y. Width 50 Cm Type 50/ 20 (Execution, Including Excavation Of Concrete Gutter In Cut Type Dr.Scc-X/Y. Width 50 Cm Type 50/ 20 (Execution, Including Excavation, Supply And Transport Of All Materials), Water Down Type Gutter Dn 1000, Exclusive Boot Outside Water Down Gutter Type Dn 1000, Subbed Regularization - 100.00% Intermediate Proctor Subbed Regularization - 100.00% Intermediate Proctor, Granulometrically Stabilized Soil Sub Base Without Mixing With Deposit Material - 100.00% Proct Granulometrically Stabilized Soil Sub Base Without Mixing With Deposit Material - 100.00% Proctor Modified, Granulometrically Stabilized Soil Base Without Mixing With Deposit Material - 100.00% Proctor M Diluted Asphalt Priming With Diluted Asphalt, Bonding Paint - Bonding Paint, Petroleum Asphalt Emulsion, Rapid Break - Dnit 165- 2013 Em - Cationic Asphalt Emulsions R Petroleum Asphalt Emulsion, Rapid Break - Dnit 165- 2013 Em - Emulsions Cationic Asphalt Rr-1-C - 307.00 Paved Transport Of Bituminous Material With Distributor Tank Truck - Paved Highway, Execution And Application Of Hot Machined Bituminous Concrete (Cbuq), Commercial Mass, Including Fo Execution And Application Of Hot Machined Bituminous Concrete (Cbuq), Including Supply And Transport Of Aggregates And Bituminous Material, Exclusive Transport Of Mass Asphalt To The Track, Transporting Bituminous Material With A Distributor Tank Truck - Paved Highway. 0.5Mm -, D0.8 Steel Regulation Plate
|