|
Work Sign 4.00 X 2.00 M, Made Of Galvanized Steel Sheet, Including Wooden Frame And Spikes. (Un)Building Plate 4, Including Wooden Frame And Spikes. (Un), Excavation, Loading And Transport. 1St Cat. (M3) Excavation, Loading And Transport. 1St Cat. (M3), Cargo And Transp. 2Nd Cat. Excavation, Loading And Transport. 2Nd Cat., Lateral Deconfinement On Edge Of Pavement With Motor Grader - Naural Terrainlateral Deconfinement On Edge Of Pavement With Motor Grader - Natural Terrain, Lateral Containment With Local Soillateral Containment With Local Soil, 04/10/2026 - 16:14:22, Excavation Of Manholes In 1St Category. (M3) Excavation Of Culverts In 1St Category. (M3), Backfill And Mechanical Piling. (M3) Backfilling And Mechanical Piling. (M3), Mouth (Wing) From Bstc Ø 0.40 Mboca (Wing) From Bstc Ø 0.40 M, 60 Ø 1, 50 Mboca (Wing) Of Bstc Ø 1, 50 M, Body Of Bstc Ø 0, 40 Without Berth With Double Frame Pa-2Body Of Bstc Ø 0, 40 Without Berth With Double Frame Pa-2, 60 Without Berth With Double Frame Pa-2Body Of Bstc Ø 0.60 Without Berth With Double Pa-2 Frame, Retention Box, Landfill With Site Mat (Excavation 1St Cat+Transp+Compact) - Walk. (M3) Landfill With Canteiro Mat (Excavation 1St Cat+Transp+Compact) - Walk. (M3), Regularizacao Compac.Subleito S.A.F. 100% Piregularizacao Compac.Subleito S.A.F. 100% Pi, Brita Graduada. (M3)Graduated Brita. (M3), Hydraulic Macadam. (M3)Hydraulic Macadam. (M3), Priming With Eai Emulsion - Exclusive Emulsion (M2)Priming With Eai Emulsion - Exclusive Emulsion (M2), Supply Of Eai Emulsion - Priming (Ton)Supply Of Eai Emulsion - Priming (Ton), Bonding Painting With Rr-1C - Exclusive Emulsion. (M2)Connection Paint With Rr-1C - Exclusive Emulsion. (M2), Supply Of Rr-1C Emulsion - Bonding Paint. (Ton) Supply Of Rr-1C Emulsion - Bonding Paint. (Ton), Cbuq - New Traces - Trace 4 - Range C - (Quantity Less Than 10,000 Ton)Cbuq - New Traces - Trace 4 - Range C - (Quantity Less Than 10,000 Ton), Horizontal Signaling Strip With Solvent-Based Acrylic Resin Paint - (0.034 M2/M2). (M2) Horizontal Signage Strip With Solvent-Based Acrylic Resin Paint - (0.034 M2/M2). (M2), Reflective Signage Plate-Circle (0, 1964 M2/Ud) + Metalic Support For Reflective Signage Plate-Circle (0, 1964 M2/Ud) + Metallic Support, Reflective Signage Plate-Rhombus (0, 2025 M2/Ud) + Metalic Support For Reflective Signage Plate-Rhombus (0, 2025 M2/Ud) + Metalic Support, Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Earthmoving. (Un)Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Earthmoving. (Un), Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Regularization And Compaction Of The Subgradespecific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Regularization And Compaction Of The Subgrade, Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Sub-Base E Specific Mass Base Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Sub-Base And Base, Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Base. (Un)Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Base. (Un), Particle Size Test Of The Base Aggregate. (Un)Particle Size Test Of The Base Aggregate. (
|