1. The Subject Of The Order Are Construction Works As Part Of The Investment Task Titled: Improvement Of Energy Efficiency In The Building Of The Primary School In Przecław.2. The Task Includes Thermal Modernization Of The Building Of The Primary School In Przecław Located At Ul. Zielona In Przecław. Property Details: Ul. Zielona 50, 39-320 Przecław - Plot No. 339/46, 457 And 458. The Scope Of Work Includes: 1. Insulation Of The Foundation Walls And External Walls Of The Building, 2. Insulation Of The Ceiling Over The Passage Leading To The School Patio (Yard), 3. Insulation Of The Ceilings (Ceiling Above The First Floor, Over The Staircase, Roof Over The Side Entrance), 4. Replacement Of Windows And Doors, 5. Modernization Of The Central Heating Installation. And Lighting. In Addition, Accompanying Works Related To Thermal Modernization Will Be Carried Out, I.E. Reconstruction Of The Paving Stones And Bumpers, Renovation Of Roofs, Reconstruction Of Sewage Approaches To Downpipes, Replacement Of The Lightning Protection System, Modernization Of External Stairs, And Sealing The Roof. The Ramp For People With Disabilities Will Be Modernized. Note: The Ordering Party Informs That The Construction Design Covers A Wider Scope Of Work Than That Planned For Implementation In This Procedure. This Procedure Covers The Following Works:1. Insulation Of Foundation Walls Below Ground Level Foundation Walls Below Ground Level Are Designed To Be Insulated With A Layer Of Foundation Polystyrene Min. Eps 100, 16 Cm Thick And Thermal Conductivity Coefficient =< 0.036 W/M*K. Before Performing Thermal Insulation, The Bumpers From The Paving Slabs Should Be Dismantled. Existing Foundations Should Be Uncovered In Sections, With Due Care Being Taken To Prevent Disturbing The Soil Structure At The Level Of Their Foundation. It Is Prohibited To Deepen The Existing Foundation Level. The Exposed Surface Of Foundation Walls Should Be Cleaned And Loose And Loose Concrete Fragments, Cracks, Holes And Cavities Removed. Remove Fungi From The Cleaned Surface And Fill Any Gaps In The Concrete With A Flexible Repair Compound. Protect The Prepared Surface With A Waterproofing Layer Made Of Kmb Mass In Two Layers, Applied At An Interval. Waterproofing Should Be Carried Out In Accordance With The Product Manufacturers Guidelines. On The Insulated Surface Of The Foundations, Make A Thermal Insulation Layer Of Foundation Polystyrene Using The Gluing Method. It Is Prohibited To Use Mechanical Connectors That Break The Continuity Of The Waterproofing Mass. Place A Dimpled Foil Around The Insulation, Finished With A Masking Strip At The Level Of The Existing Terrain. Backfill The Excavations With Layers Of Soil Up To 15 Cm Thick, Mechanically Compacted To A Compaction Index Of Is = 0.97. 2. Insulation Of Foundation Walls Above Ground Level Foundation Walls Above Ground Level Should Be Insulated With Eps 100 Foundation Polystyrene, 16 Cm Thick And Thermal Conductivity Coefficient =< 0.036
Contact Information
Address
Gmina Przecław,Przecław,39-320,Podkarpackie,Pl824 - Tarnobrzeski
Contact No.
175813119172276710
Email
urzadmiejski@przeclaw.org
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111608333
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.