1. The Subject Of The Order Is The Extension And Addition Of A Two-Car Garage To The Existing Building Of The Volunteer Fire Department In Płowce On The Plot No. 142/7, Płowce Ii District In Płowce Ii, Commune. Radziejów.2. The Planned Extension Will Have The Form Of A Single-Story Building Described On A Rectangular Plan With Dimensions Of 13.0 M X 12.35 M, With A Gable Roof With A Slope Of 26.90, With Two-Way Drainage Of Rainwater To The Outside. The Form Of The Building Was Related To The Existing Fire Station Building - Its Dimensions Were Extended By Approx. 12.35 M Towards The East.3. The Main Entrance To The Building From The North, Similar To The Part Planned For Expansion. The Height Of The Existing Building And The Planned Extension At The Same Level - 8.0 M4. The Extension Walls Will Be Made Of Brick, Insulated And Finished With Thin-Layer Plaster. The Colors Of The Facade Refer To The Existing One, The Preferred Color Break Is Gray And Graphite. 5. The Roof Covering Of The Building Will Be Made Of A Sandwich Panel With An External Cladding Imitating Brick-Colored Metal Roofing Tiles. The Windows And Doors To The Building Were Designed As Pvc Joinery, White. The Entrance And Entrance Gates To The Warehouse Are Designed As Aluminum Joinery, Powder-Coated In Ral 7024. All Sheet Metal Flashings And The Rainwater Drainage System From The Roof Will Be Made Of Ral 8016 Coated Sheet Metal. 6. The Inscription Osp Płowce Is Planned To Be Placed On The Eastern Wall Of The Building. 7. Execution Of Electrical Works: Dismantling Works, Switchboards Rg And R, Installation Of Emergency Lighting And Fire Protection Switch, Internal Installation, Lightning Protection System. 8. Execution Of Sanitary Works: Installation Of Cold And Hot Water, Ventilation Installation, Installation Of Internal And External Sanitary Sewage. 2021–2027, Priority 2: European Funds For Clean Energy And Protection Of The Regions Environmental Resources, Measure 2.8: Support For Emergency Services - Local Infrastructure Of The Volunteer Fire Department.10. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Constituting Annex No. 8 To The Swz. It Is Recommended That The Contractor Conduct A Local Inspection Of The Construction Site And Its Surroundings And Obtain, At His Own Responsibility And Risk, Any Additional Information That May Be Necessary To Prepare The Offer, Conclude The Contract And Perform The Order. The Contractor Undertakes To Properly Perform The Subject Of The Order, In Accordance With The Requirements Specified In The Terms Of Reference And The Provisions Of The Draft Contract As Well As The Principles Of Technical Knowledge And Due Diligence.
Contact Information
Address
Gmina Radziejów,Radziejów,88-200,Kujawsko-Pomorskie,Pl619 - Włocławski
Email
zamowienia@ugradziejow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111608247
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.