1.1. The Subject Of The Order Is The Construction Of A Sanitary Sewage System In The Town Of Międzyrzecz - Construction, Catchment Area Ps3.1.2. The Scope Of The Investment Includes The Construction Of A Sanitary Sewage System In The Area Of Międzyrzecz - Wybudowanie, Ps3 Catchment Area And The Construction Of A Section Of The Pressure Sanitary Sewage System From Pz 57 - Pz 87 + Drilling Under The Road From Pz 87 - Connection Of The Existing Sanitary Sewage System With The Ps3 Catchment Area, Including: - Construction Of A Ø 200Mm Pvc Gravity Sanitary Sewage System, With Gaskets Permanently Mounted In The Socket Of The Class Pipe. 8Kn/M2, Equipped With Inspection Wells Ø1.2M Concrete C35/45, - Construction Of Sanitary Sewage Connections Ø 160Mm Pvc, With Gaskets Permanently Mounted In The Socket Of The Pipe Class 8Kn/M2, Plugged With A Ø 160Mm Pvc Plug At The Border Of The Connected Plots (The Proposed Route Of Connections On The Connected Plots Is Marked On The Development Design, The Routes Have Been Preliminarily Agreed With The Property Owners, The Location Should Be Finally Confirmed With The Owner Before Construction Begins), - Pressure Sewage Made Of Pipes Ø 110X6.6 Sdr17 Pn10 Equipped With An Inspection Chamber Ø 1.2 M Concrete C35/45, - Sewage Pumping Station - Ps3 Pumping Station With Development Of The Area Next To The Facility, Passable Version, - Pre-Metering Electrical Installation For The Sewage Pumping Station, - Removal Collision Of The Sewerage Design With Existing Connections Ø 32Mm Pe (Shifting And Recessing Of The Existing Connections).1.3. Due To The Terrain, The Sewage System Was Designed In A Gravity-Pressure System. All Sewage Will Be Collected Through Gravity Sewers And Discharged To The Designed Sewage Pumping Station (Pressure Station), From Where The Sewage Will Then Be Discharged Through The Designed Pressure Pipelines To The Newly Built Sewage System (Plot No. 17/36, Kuźnik District). 1.4. List Of Pipeline Lengths For The Entire Task: A) Gravity And Pressure Sewage Network - Ø 200 Mm Pvc-U, Sn8 - 322.78 M - Ø110x6.6 Sdr17 Pn10-Rc - 192.26 M B) Sewage Connections - Ø160 Mm Pvc-U, Sn8 - 128.99 Mc) Connections Water Supply - Removal Of Interference - Ø 32Pe Sdr17 - 12.00 M1.5. The Implementation Of The Investment Covered By This Order Is Included In The Budget Of The Międzyrzecz Commune In The Multiannual Financial Forecast For 2026 And 2027, Which Means That The Ordering Party Has Planned Its Financing In This Period. Settlement For The Subject Of The Order Will Be Made Partially Up To The Amount Of Funds Available In The Budget For Each Calendar Year. The Payment Of The Contractors Remuneration In 2026 Will Not Exceed Pln 800,000.00, The Remaining Part Of The Remuneration Will Be Paid In 2027.
Contact Information
Address
Gmina Międzyrzecz,Międzyrzecz,66-300,Lubuskie,Pl431 - Gorzowski
Email
zamowienia.publiczne@miedzyrzecz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111608113
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.