|
Monitoring And Control Services – Level 2 Controls Framework Contract - Kn2 - Htbt Posts. This Contract Concerns The Establishment Of A Framework Contract For The Carrying Out Of Level 2 Controls Of Htbt (High Voltage / Low Voltage) Electrical Transformation Stations As Part Of The National Omega Program, Led By Sncf Immobilier. This Framework Contract Aims To Support Establishment Directors Of Sa Voyageurs In Order To Guarantee Regulatory Compliance Of Electrical Installations (Labor Code, Articles R4544-1 To R4544-11, And Standards Nfc 18-510, Nfc 15-100, Nfc 13-200), To Improve The Robustness Of The Electrical Supply To Ensure The Continuity Of Operation Of Passenger Services, And To Assess The Quality Of Maintenance Operations As Well As Level 1 Controls. The Services To Be Carried Out In This Context Include: - In-Depth Technical Checks Of Hvv Substations, Covering Documentary Analysis (Technical Files, Verification Reports, Diagrams, Operating Instructions), On-Site Visits (Mv/Lv Equipment, Protection Devices, Earthing Diagrams, Building Aspects), And The Assessment Of Conformity With The Standards In Force, - Overall Assessment Of Each Substation, Integrating Technical Aspects, Obsolescence, Safety, Compliance, Robustness, Capacity/Needs Adequacy, And Building Conditions, - Analysis Of Maintenance Processes And Level 1 Controls, With Identification Of Areas For Improvement, - Development Of Multi-Year Action Plans For The Modernization, Compliance, And Adaptation Of Installations To Operational Needs, Including Budgetary Programming. These Services Aim To: - Ensure Compliance Of Electrical Installations With Applicable Regulations And Standards, And Provide Proof Of This To Control Bodies (Prefectures, Labor Inspectorates, Etc.), - Strengthen The Safety Of Employees, Workers And Third Parties By Preventing Electrical Risks, - Guarantee The Robustness Of The Electrical Supply To Maintain Continuity Of Passenger Service, - Provide A Complete And Hierarchical Vision Of The Installations, Making It Possible To Effectively Manage Corrective And Preventive Actions, - Optimize Maintenance And Investments Via A Multi-Year Program Of Works, Providing Clear Budgetary Visibility. The Scope Concerns At Least 231 Identified Htbt Substations, Distributed Throughout The National Territory. Duration Of The Framework Contract: 3 Years Firm, Renewable Twice For 1 Year. The Purpose Of This Contract Notice Is To Receive Your Applications. The Attached Documents Are Provided For Information Purposes Only. No Offer Should Be Sent At This Stage Of The Consultation.
|