|
Construction Work - Framework Agreement For Construction Works 4.. In Relation To The Properties In The Asset Management Of Semmelweis University (A Total Of 526,824 M2 Of Usable Floor Area With The Associated Plots And Buildings), The Provision Of Maintenance, Renovation, Reconstruction, Rebuilding, Expansion, Modernization And Restoration, Co-Construction Activities On The Building And/Or Area Of The Medical Institution That Is Continuously Operating As Intended, Without Hindering Patient Care, As Described In The Public Procurement Technical Description Accordingly. Broken Down By Sector, The Contractors Task Is In Particular The Maintenance, Installation, Replacement, Restoration, Renovation, New/Reconstruction And Reconstruction Of The Following Building Structures, Structural Parts And Elements: Architecture - Masonry Structures And Assembled Walls, Concrete Structures, - External And Internal Plastering, - Floor And Wall Coverings, - Dry Construction Structures, - Prefabricated And Metal And Steel Structures, Doors And Windows, - Building Carpentry Structures, - Locksmith Structures, - Glazing, - Painting And Coating, Surface Preparation, - Insulation Against Rainwater, Technological And Operational Water, Heat And Sound Insulation, Radiation Protection Structures - Built-In Furniture And Other Building Accessories, - Built-In Shading Technology Equipment, - Signboards, Information Signs, - Carpentry Structure Of High Roofs, Including Covering And Additional Structures, Tinning, - Insulation Of Flat Roofs With Additional Structures Together, Tin Works, - Plastered, Installed And Paved Facades, - Sidewalks Around Buildings, Paving, Entrance And Internal Stairs, Railings, Foot Grates, - Gutters, Surface Water Drainage, Road Surfaces And Road Markings, - Traffic Signals And Direction Signs, - Garden Benches, Fences And Gates. Building Engineering - Water Supply And Sewage Drainage Equipment And Fittings, - Pressure And Drain Lines And Their Fittings, - Water Treatment Equipment, Pumps, Pressure Boosters, Level Switches, - Waste Water Reservoirs, Grease Traps, Waste Water Lifters, - Sewerage Works, Covers, - Boilers, Hot Water Production Equipment And Their Fittings, - Central Heating Radiators, Convectors, Thermal Ventilators, Fan-Coils And Their Fittings, - Central Heating And Cooling Pipelines And Their Fittings, - Ventilation Equipment, Fans, Heat Exchangers, Convectors, - Air Filters, Noise And Vibration Dampers, - Ventilation Pipelines, Air Ducts, Shut-Off And Control Structures, - Natural Gas Consumer Equipment, Consumer Lines And Devices, Their Fittings, - Mechanical Renewable Energy Utilization. Building Electricity (Power Current) - From The 0.4 Kv Receiver - Excluding It - Through Sub- And Level Distributors And Switching Equipment To The Connection Endpoints And Light Sources - Including Them - The Entire Electrical Network, In Particular - The Electrical Safety And Protection Units (Fuses, Contact Protection Relays, Etc.), - All The Switching Elements (Dusk Switch, Time Switch, Etc.), - The Lighting Network All Elements (Space Lighting, Building Lighting,
|