The Subject Of The Order Is: Integration Of Non-Urban Public Transport With Individual Transport In The Skierniewice Commune. General Characteristics Of The Investment That Is The Subject Of The Order. The Subject Of The Order Is The Reconstruction Of Municipal Roads No. 115356E And 115351E In The Towns Of Mokra And Mokra Lewa. The Reconstruction Of Roads Involves The Construction Of A Bicycle Path, Which For The Purposes Of Description Has Been Divided Into Two Sections: • Section. Acb From Km 0+000 To Km 2+848, 2848 Meters Long, Along Municipal Road No. 115356E.• Section. Cd From Km 0+000 To Km 0+184 And From Km 0+230 To Km 1+015 With A Total Length Of 969 M Along Municipal Road No. 115351E (From Km 0+184 To Km 0+230 There Is A Railway Crossing Not Covered By The Study. The Following Works Will Be Performed As Part Of The Reconstruction: - Construction Of A Bicycle Path With A Width Of 2.20 M To 2.66 M - Unification Of The Surface Of Exits In The Line Of The Bicycle Path, - Sectional Widening Of The Road To Enable The Location Of The Bicycle Path On The Opposite Side Of The Road (The Road Widening Covers A Total Of 670 M). - Reconstruction Of Water Facilities (Drainage Ditches) - I.E. Covering Some Of The Ditches, Replacing The Ditches With French Drainage, Construction And Reconstruction Of Culverts And Construction Of Inlets With Sewers), - Designation Of Bicycle Routes, - Installation Lighting Of Bicycle Crossings And Bicycle Shelters, - Installation Of Two Bicycle Shelters. Existing Condition With Expected Changes. The Municipal Road On The Section In Question Has An Asphalt Surface With A Width Of 4.00 M To 4.50 M. The Road Is Equipped With Dirt Shoulders On Both Sides And Exits With Different Surfaces, And There Are Deodorizing Ditches In Sections, Which Are Largely Disappearing. The Changes Will Consist In Locating On The Northern Side In The Case Of Road No. 115356E And On The Eastern Side In The Case Of Road No. 115151, A Bicycle Path With A Width From 2.20 M (In Case Of Difficult Terrain Conditions) To 2.66 M. In Addition, Two Bicycle Shelters Will Be Installed, Housing At Least 24 Bicycles Each, And 7 Led Hybrid Lamps Will Be Installed As Part Of Road Safety Devices, Including Five With Active Marking. All Exits Along The Path Will Have A Uniform Surface Made Of Concrete Cubes. A Detailed Description Of The Construction Works Is Included In The Bill Of Quantities, Design Documentation And Technical Specification For The Execution And Acceptance Of Construction Works Constituting Annexes To This Swz.
Contact Information
Address
Gmina Skierniewice,Skierniewice,96-100,Łódzkie,Pl715 - Skierniewicki
Email
przetargi@gminaskierniewice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111548126
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.