|
Architectural, Construction, Engineering And Inspection Services – Jürgen Schumann Barracks, Building 28, Implementation Of Fire Protection Concept - Property Planning For Buildings And Interiors. Building 28 Will Undergo Extensive Structural Renovation And Restructuring During Ongoing Operations. The Aim Of The Measure Is The Functional, Design And Fire Protection Renewal While At The Same Time Taking Monument Protection Into Account. The Focus Is On Dismantling Outdated Components And Surfaces As Well As Rebuilding Contemporary Spatial And Usage Concepts. Inside The Building, Floors, Ceilings, Walls And Doors Will Be Completely Renovated. Existing Floor Structures And Coverings Are Removed And Replaced With New, Long-Lasting And Heavy-Duty Coverings, Especially In Classrooms, Hallways And Sanitary Rooms. Raised Floors Are Dismantled And Replaced With New Substructures. Robust, Easy-Care Surfaces Are Used In Sanitary Areas, Supplemented By New Partition Systems And Sanitary Fittings. Some Of The Interior Walls Will Be Rebuilt, Adjusted Or Closed To Allow For Modified Room Layouts. This Includes New Lightweight Construction And Drywall Walls As Well As Selective Interventions In Load-Bearing Components That Are Structurally Secured. Cracks And Damaged Areas In The Existing Building Are Repaired, Surfaces Are Filled And Uniformly Recoated. Ceilings Will Be Completely Renewed And Given New Suspended Constructions With Acoustic And Fire Protection Properties. Windows And External Doors Are Revised Or Replaced, With The Design, Dimensions And Coloring Remaining Adapted To The Existing Structure. Fire-Retardant Windows Will Be Installed In The Stairwell And Smoke And Heat Exhaust Openings Will Be Modernized. In The Entrance Area, Accessibility Is Improved By Installing An Electric Door Opener. In Addition, Sun Protection Will Be Provided On The South Facade. An Essential Part Of The Measure Is The Extensive Dismantling Of Existing Components. These Include Ceilings, Interior Walls, Doors, Floor Coverings And Partition Systems. All Demolition Work Is Carried Out Professionally With Appropriate Disposal, Including Possible Contaminated Materials. Once The Construction Work Has Been Completed, Final Construction Cleaning Is Planned For Sections. Roof And Fire Protection Requirements Will Also Be Adjusted, Particularly In Relation To New Penetrations. A New Ventilation System With Heat Recovery And Air Conditioning Will Be Installed. Excavation And Civil Engineering Work Is Carried Out Outside, Especially To Create Utility Trenches. Paths, Streets And Green Spaces Affected By The Construction Work Will Be Restored Upon Completion. Paving Areas And Asphalt Surfaces Are Removed And Professionally Reinstalled, Green Areas Are Provided With Topsoil And Reseeded. Description Of The Services To Be Awarded Eligible Costs According To Relevant Cost Groups Cost Group 300 Approx. €2,055,529.90 Net Cost Group 400 Approx. €10,182,917.35 Net Dates Start Of Construction June 1St, 2027 End Of Construction Period December 31St, 2031
|