|
Supervision Of Construction Work - Performing The Function Of Contract Engineer For The Investment: Expansion Of The Łęgi And Spyrkówka Sewage Treatment Plants In Zakopane - Stage Iii. 1. The Subject Of The Order Is The Provision Of The Contract Engineers Service Related To The Management, Control And Supervision Of The Implementation Of The Construction Contract, Hereinafter Also Referred To As The Construction Task, The Subject Of Which Is The Expansion Of The Łęgi And Spyrkówka Sewage Treatment Plants In Zakopane - Stage Iii, In Accordance With The Design Documentation Held By The Ordering Party And Decision No. 282/2022 Of July 25, 2022, Approving The Construction Design And Granting The Building Permit, As Well As The Demolition Notification Of November 17, 2021. 2. The Subject Of The Order Is To Act As The Contract Engineer During The Implementation Of Construction Works Described In The Projects Of The Architectural And Construction, Technological, Sanitary, Electrical, Instrumentation And Control, Road And Bridge Industries, Mechanical And Biological Sewage Treatment Nodes, For The Following Construction Facilities: 2.1. Ows Primary Settling Tank (Ob.44; 44.1), 2.2. Aerated Sand Trap Pn (Ob.41) With Connection Chamber Pna (Ob.41.1), 2.3. Fat Chamber Kt (Ob.43), 2.4. Bkx/Sdpy Grid Building (Ob.1), 2.5. Roads And Terrain, 2.6. Technological Networks, 2.7. Electricity And Instrumentation, 2.8. Permanent Bridge, 2.9. Demolition, 2/10. Pf Flotate Pumping Station (Ob.45), 2.11. Sdky Coagulant Dosing Station (Ob.47), 2.12. Rby Biological Reactor (Ob.48), 2.13. Sewage Separation Chamber For Secondary Settling Tanks (Ob.49), 2.14. Secondary Settling Tanks Owy1, Owy2 (Ob.50.1,50.2), 2.15. Kpy Measuring Chamber (Ob.51, 52), 2.16. Sdy Blower Station (Ob.53), 2.17. Secondary Sludge And Process Water Pumping Station (Ob.54), 2.18. Sdw Coal Dosing Station (Ob.55), 2.19. Fda Deodorization Filter (Ob.56) 2.20. Pt Technological Pumping Station (Ob.57), 2.21. Sppy Sampling Well (Ob.58), 2.22. Bky Grating Hall (Ob.121), 2.23. Biofilter Bf (Ob.122), 3. The Engineer Is Also Responsible For Supervising The Start-Up Of Devices And Technological Processes At The Sewage Treatment Plant And Their Proper Connection With The Existing Sewage Treatment Technology. 4. The Engineer Will Support The Ordering Party In Settling The Project. 5. The Construction Contract Will Be Implemented In The Build System Based On The Design Provided By The Ordering Party.
|