|
The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Fence For The Recreational Area In Gródek Krajeński, Divided Into Two Scopes. Range No. 1 - Fence Length Approx. 481 M, Number Of Gates - 3 Pcs. (Including: 1 Pc. With Dimensions Of 8.5 M And 2 Pcs. With Dimensions Of 3.5 M), Number Of Wickets - 3 Pcs. (Dimensions: 100X170 Cm). Scope No. 2 - Fence Length Approx. 204 M, Number Of Gates - 2 Pcs. (Measuring 3.5 M), Number Of Wickets - 4 Pcs. (Measuring 100X170 Cm). Location - Gródek Krajeński, Dźwierszno Małe, Plots No. 148/25, 148/26, 148/27, And Part Of The Plot No. 146/85. The Investment Area Is A Developed Recreational Area. Execution Of Construction Works Based On The Provided Drawings, As Well As On The Basis Of Stwior And Swz Provisions, Consisting Of: 1) Construction Of A Fence, 2) Installation Of Gates And Wickets, 3) Preparation And Measurement Works (Geodetic Marking Out, Site Preparation), 4) Execution Of Earthworks (Excavations For Foundations, Posts), 5) Execution Of Foundations, Foundation Footings, 6) Installation Of Posts Fencing And Structural Elements, 7) Installation Of Fence Spans, 8) Installation Of Gate And Wicket Equipment (Locks, Hinges, Door Closers, Etc.), 9) Restoration Of The Area After The Works (Supplementing The Surface, Tidying Up The Area, Etc.), 10) Performing An As-Built Surveying Inventory. Panel Fence: − Panel Height: 1730 Mm, − Panel Width: 2500 Mm, − Mesh Parameters: Rod Diameter 5 Mm, Mesh Dimensions 50 Mm X 200 Mm And 50 Mm X 50 Mm, − Structure: 3 Reinforcing Bends, 3 Clamps Per Post, − Posts: Rp 60X40 Profile, Height 2300 Mm, − Axial Spacing Of The Posts: Approx. 256 Cm, − Foundation: Concrete Footings With Dimensions Of 0.4 X 0.4 X 0.8 M Made Of C20/25 Concrete, − Anti-Corrosion Protection: All Elements (Fences And Gates) Must Be Hot-Dip Galvanized. − Finish: Polyester Powder Coating. − Color: Green (Ral 6005).10. General Information: 1) All Elements Of The Documentation Constituting Annexes To The Procedure, In Particular The Descriptive Part Of The Design Documentation, Drawings And The Scope Of Works Constitute A Description Of The Subject Of The Order. All These Documents Should Be Treated As Complementary And Equivalent. Including A Given Element Of Works In Any Of The Documents Means That It Is The Subject Of The Order.2) When Submitting An Offer, The Contractor Is Obliged To Include In The Offer Price All Costs Related To The Execution Of The Order, Including In Particular The Costs Of Utility Consumption, Such As Electricity, Water, Waste Disposal, Site Protection And Other Costs Necessary For The Proper Performance Of The Works.3) The Contractor Bears Full Responsibility For The Works Site From The Date Of Its Protocol Handover To The Date Of Final Acceptance, Including Its Protection, Marking And Organization Of The Works. A Way That Ensures The Safety Of Third Parties And Property.4) The Contractor Is Obliged To Carry Out The Works In Accordance W
|