|
Supply Of Inputs Of The Type Of Civil Construction And Structural Materials (Cement, Sand, Crushed Stone, Masonry, Reinforced Concrete Structures, Roofing, Coatings, Wood, Steel Rebar, Iron Mesh And Others) In The Manner Established In The Price Reference Spreadsheets Described In The Sinapi Table (Sc) In Force - Not Exempted. With Bdi Fixed At 23, 74%, Supply Of Inputs Such As Construction Materials, Maintenance And Renovation Of Hydraulic And Hydrosanitary Installations (Pvc Pipes, Connections, Siphon Boxes, Taps, Records And Others) In The Form Established In Input Price Reference Spreadsheets Described In The Current Sinapi Table (Sc) - Not Unencumbered With Bdi Fixed At 23, Maintenance And Refurbishment Of Electrical Installations (Cables And Wires, Circuit Breakers, Sockets, Switches, Electrical Panels, Luminaires And Others) In The Form Established In Input Price Reference Spreadsheets Described In The Current Sinapi Table (Sc) - Not Exempted With Bdi Fixed At 23, Supply Of Inputs Of The Material Type For Manufacturing, Maintenance, Renovation And Installation Of (Finishing Materials Paints, Varnishes, Spackle, Flooring, Porcelain, Tile, Ceramic, Grout And Others) In The Form Established In Spreadsheets Of Miscellaneous Inputs Described In The Current Sinapi (Sc) Spreadsheet - Not Relieved With Bdi Set At 23, Renovation And Installation Of (Paving Materials, Such As Hexagonal Tile And Others) In The Established Manner In Miscellaneous Input Spreadsheets Described In The Current Sinapi (Sc) Spreadsheet - Not Exempted With Bdi Set At 23.99%, 04/02/2026 - 10:58:11, Labor Services) For Construction, Maintenance And Renovation Of Electrical Installations, Based On The Current Sinapi Sc Table, Not Exempted. With Bdi Set At 23, Labor Services) Maintenance, Renovation, Equipment, Building Supplies (Carpenter, Bricklayer, Painter And Others) With Bdi Set At 23, In Cobblestone Pavements With Bdi Set At 23
|