|
Supply Of Inputs Of The Type Of Civil Construction And Structural Materials (Cement, Sand, Crushed Stone, Masonry, Reinforced Concrete Structures, Roofing, Coatings, Wood, Steel Rebar, Iron Mesh And Others) In The Manner Established In The Price Reference Spreadsheets Described In The Current Sinapi Table (Sc) - Not Exempted. With Bdi Fixed At 23.74%, Supply Of Inputs Of The Type Construction Materials, Maintenance And Renovation Of Hydraulic And Hydrosanitary Installations (Pvc Pipes, Connections, Siphon Boxes, Taps, Records And Others) In The Form Established In Input Price Reference Spreadsheets Described In The Current Sinapi Table (Sc) - Not Exempted With Bdi Fixed At 23, Maintenance And Renovation Of Electrical Installations (Cables And Wires, Circuit Breakers, Sockets, Switches, Electrical Panels, Luminaires And Others) In The Form Established In Input Price Reference Spreadsheets Described In The Current Sinapi Table (Sc) - Not Relieved With Bdi Fixed At 23, 74, Supply Of Material Type Inputs For Manufacture, Maintenance, Refurbishment And Installation Of (Finishing Materials Paints, Varnishes, Spackle, Flooring, Porcelain, Tile, Ceramics, Grout And Others) In The Form Established In Miscellaneous Input Spreadsheets Described In The Current Sinapi (Sc) Spreadsheet - Not Relieved Of Exemption With Bdi Set At 23, Refurbishment And Installation Of (Materials Of Paving, Such As Hexagonal Tile And Others, 04/02/2026 - 13:12:36, Labor Services) For Construction, Maintenance And Renovation Of Electrical Installations, Based On The Current Sinapi Sc Table, Not Exempted. With Bdi Set At 23, Labor Services) Maintenance, Renovation, Equipment, Building Supplies (Carpenter, Bricklayer, Painter And Others) With Bdi Set At 23, In Cobblestone Pavements With Bdi Set At 23, 99%
|