|
Supply Of 1] Remvng,Hyacinth 12000.000 M2,[2] Clng,Open Channel 16550.000 M3,[3] Clng,Pipe,>Dia3Ft 400.000 M,[4] Disman,Pcc/Rcc In All Propotion 45.000 M3,[5] Earth Wrk,Excav In All Soils,Scrap 5700.000 M3,[6] Pcc Wrk,Labour,Tools,Material,1:2:4 40.000 M3,[7] Brick Wrk,Cm1:6,Cl-75 45.000 M3,[8] Cement Concrete Wrk,Depth As 19Mm,1:2:4 40.000 M3,[9] Cutg,Bending,Fixg,Tmt Rebars,Ms 4500.000 Kg,[10] Remvng,Deposition,Silt Etc Frm Drain 850.000 M3,[11] Clng,Open Channel,Partial Flume Etc 1900.000 M3,[12] Clng,Box Culvert Boundary Wall 420.000 M3,[13] Prvdg,Shuttering F/Drain,Manhole 600.000 M2,[14] Clng,Drain Of Muck,Silt Etc,Upto 350Mm 17000.000 M,[15] Supply,Rcc Hume Pipe,Dia60Cm,Grade:Np3 10.000 M,[16] Layg,Pipe,Ms/Hume Pipe,Dia Upto 900Mm 90.000 M,[17] Refilg,Excavated Spoil/Earth,15Cm 100.000 M3,[18] Pcc Wrk,Cm1:3:6 By Hand Mix 17.000 M3,[19] Fixg,Manhole Cover,Ci,Sqr/Rnd/Triangle 450.000 Kg,[20] Cleaning Rmhp Bed Drains 500.000 M3,[21] Replacing Damaged Cover With M S Covers. 2.000 Mt,[22] Supply,Hume Pipe,Dia30Cm,Grade:Np2 25.000 M,[23] Spreadg,Slag Boulder/Slag Ballast 500.000 M3,[24] Fab,Strl Steel Wrk 1Coat Redoxide 2.000 To,[25] Ern,Fab Strl Steel Wrk W/Welding 2.000 To,[26] Supply,Hume Pipe,Dia50Cm,Grade:Np2 20.000 M,[27] Labour,Spreading Bf/Bof Slag Ballast 2500.000 M2
|