The Subject Of The Order Is The Execution Of The Second Stage Of Construction Works, Together With The Preparation By The Contractor Of The Documentation Necessary To Obtain An Occupancy Permit Under The Task Titled: Construction Of The Fire And Rescue Unit No. 2 Of The State Fire Service In Wołomin (Tłuszcz Headquarters) Stage Ii. During Stage I Of The Investment, A Fence And A Water Supply Connection Were Made To The Entrance To The Jrg 2 Building, And An Energy Connection Was Made To The Box In The Fence. You Should Also Calculate The Remains Of Foundations After Garden Gazebos. The Scope Of This Procedure Does Not Cover The So-Called Original Equipment. In Order To Determine The Exact Scope Of Required Work, Materials And Equipment, Contractors Are Required To Visit The Facility On-Site At The Stage Of Calculating The Cost Of The Offer. The Contractors Remuneration Is Set As A Lump Sum. The Bills Of Quantities Provided By The Ordering Party Should Be Treated As Auxiliary When Calculating The Value Of Equipment, Materials And Works. Bills Of Quantities Cannot Constitute The Basis For Settlements With The Ordering Party Regarding The Quantity And Value Of Materials, Equipment And Works. The Facility Is To Be Equipped In Accordance With The Design Documentation And Bills Of Quantities, Applicable Technical And Construction Regulations, Technical Knowledge And Complete From The Point Of View Of The Purpose It Is To Serve. The Order In Question Includes In Particular: A. Build A New Building Of Jrg 2 Tłuszcz, B. Build A Shelter For A Power Generator With A Room For Collecting Solid Waste, C. Build A Multi-Purpose Sports Field For Firefighters, D. Deliver And Erect A Flagpole, E. Deliver And Manufacture A Diesel Oil Distribution Kit With A 5,000-Litre Polyethylene Tank And An Electronic Card-Based Distributor For The Needs Of The Fire Brigade, F. Build An Underground Rainwater Tank That Will Be Used To Irrigate Greenery With A Capacity Of 10 M3,G. Build An Underground Tank For Sanitary Sewage, Which Will Be Used To Irrigate Greenery With A Capacity Of 10 M3h. Construct Maneuvering Areas, Roads, Parking Spaces And Sidewalks As Well As Exits From Pilawska Street, I. Construct Networks And Land Infrastructure Devices, Including External Water Supply Installation, Sanitary Sewage System With A Separator Of Petroleum Substances And A Sewage Pumping Station, Rainwater Sewage System, Technical Sewage System, Cable Sewage System And Power Lines, J. Perform Cold And Hot Water Installations, Sanitary Sewage, Central Heating, Mechanical Ventilation And Air Conditioning, Electrical And Photovoltaic Installations, K. Perform Telecommunications Installations, L. Build The Necessary Road Infrastructure. Organization, Security And Development Of The Construction Site, N. Preparation Of As-Built Documentation With Full And Necessary Measurements, Certificates Of Conformity, Technical Approvals, Declarations Of Conformity And Other Documents Allowing For Use Of The
|