|
The Subject Of The Order Is The Design And Execution (Design And Build Mode) Of Construction Works In An Active Public Building For Two Passenger Lifts, Consisting Of: 1. Dismantling Two Existing Passenger Lifts, Factory No./Udt: Weo 08079 / Udt N3127016028 (Left Crane - Western Vertical), Weo 08080 / Udt N3127016218 (Right Crane - Western Vertical), 2. Designing Solutions (To The Extent Resulting From The Pfu, Inventory And Arrangements),3. Preparation Of Complete Design Documentation Necessary For The Replacement Of Cranes,4. Delivery, Assembly And Commissioning Of Two New Passenger Lifts, Adapted To The Maximum Possible Extent To The Needs Of People With Special Needs,5. Execution Of All Construction, Finishing, Installation And Accompanying Works Resulting From The Design Documentation, Functional And Utility Program (Ffu), Technical Opinion,6. Obtaining The Required Arrangements, Derogations, Permits And Administrative Decisions, Including Decisions Of The Office Of Technical Inspection Authorizing Cranes For Operation,7. Providing As-Built Documentation, Instructions And Providing User Training.8. Ensuring The Technical Functionality Of Devices Enabling Their Subsequent Service, Maintenance And Remote Technical Monitoring; Mandatory Service, Maintenance And Operational Monitoring Will Be Carried Out On The Basis Of A Separate Agreement.2. The Subject Of The Order Includes The Replacement Of Two Passenger Lifts While Maintaining The Existing Lift Shafts And The Machine Room, While Adapting Them To Applicable Regulations, Accessibility Standards And The Structural Capabilities Of The Building, In Accordance With The Pfu, Technical Opinion.3. The Order Will Be Implemented In Stages, In The Following Division:• Stage I - Design Part, Including Preparation Of Complete Design Documentation, Obtaining The Required Approvals And Obtaining The Required Legal Basis For The Implementation Of Construction Works.• Stage Ii - Execution Part, Divided Into Two Sub-Stages: Stage Iia - Including Dismantling The Existing Crane No. Weo 08079 (Western Vertical - Left Crane), Delivery And Assembly Of A New Crane, Execution Of Accompanying Works And Obtaining A Decision From The Office Technical Supervision Authorizing Its Operation. The Completion Of Stage Iia Constitutes The Basis For Partial Acceptance Of The First Crane. Stage Iib - Including The Dismantling Of The Existing Crane No. Weo 08080 (Western Vertical - Right Crane), Delivery And Assembly Of A New Crane, Performance Of Accompanying Works And Obtaining A Decision Of The Office Of Technical Inspection Authorizing Its Operation. A Detailed Description Of The Subject Of The Order, Scope Of Work, Description Of The Ordering Partys Requirements Regarding The Implementation And Acceptance Of The Subject Of The Order Are Specified In: A) The Draft Provisions Of The Contract Together With Annexes - Annex No. 6 To Swzb) Description Of The Subject Of The Order - Annex No. 7 To Swzc) Functional And Utility Des
|