Tenders Are Invited For Agglomeration System Of Bicycle Paths In The Zit Mof Piły Area - Construction, Recon ... in Poland
Tender Notice
TenderID
111089035
Tender Brief
Tenders Are Invited For Agglomeration System Of Bicycle Paths In The Zit Mof Piły Area - Construction, Reconstruction And Expansion Of Pedestrian And Bicycle Routes (...) - Location I, Part Ii, Location V, Location Viii
The Subject Of The Order Is The Construction Of A Pedestrian And Bicycle Route Within The Road Of Aleja Piastów On The Section From Ul. Konopnicka To The Bolesław Chrobrego Bridge On Plots With Registration Numbers 74, 215/14, Piła 18 District. The Length Of The Pedestrian And Bicycle Infrastructure Construction Section Is Approximately 117 M. The Project Assumes The Construction Of A Pedestrian And Bicycle Route With A Surface Of The Pedestrian Part Made Of Concrete Cubes On A Cement-Sand Ballast, And The Bicycle Part With An Asphalt Concrete Surface. The Basic Substructure For The Pedestrian And Bicycle Route Is Made Of A Non-Aggregate Mixture. Under The Foundation Layer, A Layer Of Improved Subgrade Stabilized With A Hydraulic Binder Should Be Made - After Obtaining The Secondary Deformation Modulus And Soil Compaction Index Consistent With The Design. The Order Also Includes The Construction Of Green Belts Sown With Grass In The Vicinity Of The Pedestrian And Bicycle Route And The Introduction Of Permanent Traffic Organization Signs. If It Is Not Possible To Make A Surface Of Bituminous Mass Arranged In One Layer, With Proper Compaction, The Contractor Will Perform The Above-Mentioned. Surface In Two Layers Without Additional Claims For The Indicated Scope Of Work Towards The Ordering Party. The Ordering Party Will Select Archaeological Supervision And Investor Supervision In A Separate Procedure. As Part Of The Order In Question, You Must Cooperate With Supervision Inspectors. The Contractors Tasks Include Preparing And Providing The Ordering Party With As-Built Documentation, Including An As-Built Geodetic Map. As Part Of The Order, Temporary Traffic Organization Should Be Developed And Approved For The Duration Of The Works. Construction Works Can Begin After Approval Of The Temporary Traffic Organization Design For The Duration Of The Works. The Project Should Be Presented To The Ordering Party Within 7 Days Of Signing The Contract. The Contractor Will Ensure That He/She Will Act As A Construction Manager For The Scope Covered By The Documentation. The Construction Manager Should Have Construction Qualifications To Manage Road Works. The Detailed Scope Of The Order Is Specified In The Design And Cost Estimate Documentation.
Contact Information
Address
Zarząd Dróg I Zieleni W Pile,Piła,64-920,Wielkopolskie,Pl411 - Pilski
Email
zampubl@zdiz.pila.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111089035
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.